You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Innovative AI Video Analysis of Dilemma Zone Conflicts at Signal-controlled Intersections using Edge Computing and 5G
SBC: INNOVATIVE AI TECHNOLOGIES LLC Topic: 22FH2To address the critical needs of protecting road users from harmful traffic conflicts, a project is proposed for innovative AI video analysis of dilemma zone conflicts at signal-controlled intersections using edge computing and 5G. Specifically, the proposal applies innovative AI, advanced video analysis, and deep learning technologies, which show promising preliminary results, for automatic and r ...
SBIR Phase I 2022 Department of Transportation -
INNOVATIVE LAYERED COMPOSITE METAL DECK SYSTEM
SBC: Acrow Corporation Of America Topic: 20FH2This project investigates an innovative modular steel bridge deck system of a “sandwich” design for achieving the necessary stiffness in orthogonal directions employing two steel plates separated by a steel stiffening core.Such a layered composite deck could become an ideal solution for the next generation of bridge applications.With the appropriate choice of the core profile, the transverse s ...
SBIR Phase II 2022 Department of Transportation -
INNOVATIVE LAYERED COMPOSITE METAL DECK SYSTEM
SBC: Acrow Corporation Of America Topic: 20FH2This project investigates an innovative modular steel bridge deck system of a “sandwich” design for achieving the necessary stiffness in orthogonal directions employing two steel plates separated by a steel stiffening core.Such a layered composite deck could become an ideal solution for the next generation of bridge applications.With the appropriate choice of the core profile, the transverse s ...
SBIR Phase I 2020 Department of Transportation -
Creating Spatial Disorientation in Flight Simulation
SBC: CONTINUUM DYNAMICS INC Topic: 122FA1Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...
SBIR Phase I 2013 Department of Transportation -
Reducing Traffic Pressure During Hazmat Incidents By Utilizing Situation Awareness Capabilities
SBC: Drakontas LLC Topic: N/AThis proposal responds to DOT topic 081-PH2 "Hazardous Materials (Using Handheld Devices to Assist in Emergency Response to Hazardous Materials Incidents)." The significant innovation in this project involves extending cutting edge tools developed to enhance situation awareness among first responders with appropriate hazmat and traffic information to create a framework for interperting traffic re ...
SBIR Phase I 2008 Department of Transportation -
Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines
SBC: Outside Plant Consulting Services, Inc. Topic: N/AThe proposed buried innerduct/duct network (BIN) comprises an integrated system to facilitate future upgrades of buried communications (telephony, CATV) and power lines. The objective of the project is to provide improved, cost-effective hardware and practices relative to present buried construction procedures, which do not otherwise allow for future upgrades or replacement of initially installed ...
SBIR Phase II 2007 Department of Transportation -
Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines
SBC: Outside Plant Consulting Services, Inc. Topic: N/AThe feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...
SBIR Phase I 2004 Department of Transportation -
N/A
SBC: PHYSICAL ACOUSTICS CORP. Topic: N/AN/A
SBIR Phase I 2000 Department of Transportation -
N/A
SBC: PHYSICAL ACOUSTICS CORP. Topic: N/AN/A
SBIR Phase II 2000 Department of Transportation -
N/A
SBC: Zeta-Tech Associates, Inc. Topic: N/AN/A
SBIR Phase I 2000 Department of Transportation