You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. "ZERO Plastic" shipping containers for fabricating new parts from waste plastics

    SBC: ZERO PLASTIC LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  2. Widely Tunable III-V Based Epsilon-near-zero tunneling diodes for room-temperature infrared detectors and light sources

    SBC: AMETHYST RESEARCH INC            Topic: OSD21C004

    High performance infrared photodetectors and light sources that span infrared wavelengths from 2 to 14 microns and beyond are critical to DoD. At the longer wavelengths these devices demand stringent cooling requirements, which add size, weight, power consumption and cost. In this program we are developing tunnel diodes based on epsilon near zero (ENZ) metal-insulator-metal (MIM) rectenna structur ...

    STTR Phase II 2023 Department of DefenseOffice of the Secretary of Defense
  3. Magnetically Coupled Blade Pitch Control for Vertical Lift Applications

    SBC: SPECIFIC IMPULSES INCORPORATED            Topic: N231017

    Specific Impulses Incorporated has developed a novel method for enabling individual blade pitch control for rotorcraft.  Two reduced scale prototypes have been constructed and have successfully demonstrating the core concept.  The goal for this Phase I effort is to improve the existing prototypes and analytical models in support of the preliminary design of a larger scale technology demonstra ...

    SBIR Phase I 2023 Department of DefenseNavy
  4. Conformable infinite Composite Pressure Vessel (CiCPV) for Hydrogen Storage

    SBC: INFINITE COMPOSITES, INC            Topic: A234011

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  5. Multimodal AI Air Traffic Sensor Fusion for Automated Surveillance and Alerting ("Bird Brain")

    SBC: THRUST AI LLC            Topic: X22DOTCSO1

    Warfighters operating in forward-deployed and stateside airspace environments lack central situational awareness and decision support capabilities which detract from mission-critical functions including flight safety, air traffic management, integrated ai

    STTR Phase II 2023 Department of DefenseAir Force
  6. High-Performance Small Wind Turbine Blade for Mass Production

    SBC: BERGEY WINDPOWER COMPANY, LLC            Topic: C5617a

    Under new federal incentives, sales of small wind turbines for farms and rural homes are increasing exponentially, but the current methods of blade production do not scale well and are limiting manufacturing growth. The current manufacturing method involves hours of hand work and a total manufacturing cycle of several days. Faster and less expensive methods of producing small wind turbines blades ...

    SBIR Phase I 2023 Department of Energy
  7. Process Engineering Technology for Manufacture of High-Performance Radiation Detection Semiconductor Materials

    SBC: AMETHYST RESEARCH INC            Topic: C5603a

    C56-03a-273587For national security and non-proliferation missions, there is a need for the development of radiation detectors that simultaneously exhibit good energy resolution, high efficiency, high sensitivity, and good uniformity over an area > 15 cm2 without a need for deep cooling. The development of new materials is seen as a leading option for fulfilling this need. In work by other groups, ...

    SBIR Phase I 2023 Department of Energy
  8. Vacuum Regenerable Sorbents For CO2 and Humidity Control within the xEMU

    SBC: XPLOSAFE LLC            Topic: H4

    In this Phase II SBIR, XploSafe will build on its Phase I work to advance the development and evaluation of sorbents identified during the Phase I. Phase I results demonstrated the feasibility of sorbent candidates as viable replacement for the current carbon dioxide and humidity control solution. The developed materials exhibit significant advantages including higher CO2 capacity and easier regen ...

    SBIR Phase II 2023 National Aeronautics and Space Administration
  9. STTR Phase I:Cardiotropic Atorvastatin Liposomes for Myocardial Reperfusion Injury

    SBC: Vibhudutta Awasthi            Topic: PT

    The broader impact/commercial potential of this Small Business Technology Transfer (STTR) Phase I project pertains to the critical need for pharmacologic treatments in large populations that suffer from coronary artery disease and that are subjected to procedures such as angioplasty or bypass surgery. While effective in correcting the reduced flow of blood to the heart tissue, these interventions ...

    STTR Phase I 2023 National Science Foundation
  10. Better Decision-Making in Caring for the Air Force's Greatest Asset: AI-Enhanced Medical Extended Reality

    SBC: Xironetic LLC            Topic: AFX235CSO1

    Medical Airmen must always be prepared for the extraordinary demands of a wartime scenario, but recent reports of declining AFMS patient volumes coupled with limited exposure to battlefield trauma cases limits their readiness to perform in such an environ

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government