You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
VIDEO COMPRESSION FOR TRANSMISSION OF ATC DISPLAYS TO REMOTETOWER CAB
SBC: DELTA INFORMATION SYSTEMS INC Topic: N/AN/A
SBIR Phase I 1991 Department of Transportation -
LARGE AREA INSPECTION OF FIBERGLASS MARINE HULLS
SBC: Industrial Quality, Inc. Topic: N/AA PROGRAM IS PROPOSED TO DEVELOP AN INFRARED THERMAL INSPECTION APPLICATION FOR THE EXAMINATION OF BARE AND COATED FIBERGLASS HULL STRUCTURES. PRIOR WORK HAS DEMONSTRATED THE APPLICABILITY OF THE INFRARED APPROACH TO THE INSPECTION OF THIS TYPE OF MATERIAL. SEVERAL TECHNIQUESWILL BE EVALUATED FOR THE APPLICATION OF THE THERMAL LOAD NEEDED TO PERFORM THE TEST. INFRARED THERMOGRAPHY OFFERS VERY RADI ...
SBIR Phase I 1991 Department of Transportation -
LOW-COST GAURDRAIL END TREATMENTS
SBC: MACSEA LTD Topic: N/AN/A
SBIR Phase I 1991 Department of Transportation -
USCG PV POWER SUPPLY
SBC: OMITRON, INC. Topic: N/ATHE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY PHOTOVOLTAIC POWER SUPPLY DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS TO REMOTE MONITORING STATIONS. DESIGN WORK WILL DEVELOP NEW APPROACHES TO THE UTILIZATION OF SOLAR CELL ARRAYS TO GENERATE ELECTRI ...
SBIR Phase I 1991 Department of Transportation -
USCG BUOY STATUS MONITOR
SBC: OMITRON, INC. Topic: N/ATHE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY STATUS MONITOR AND REPORTING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH THE BUOY PHOTOVOLTAIC POWER SUPPLY AND THE BUOY POSITION MONITORING SYSTEM FOR COMMUNICATION WITH REMOTE MONITORING STATIONS. THE SYSTEM WILL BE MODULAR AND EXTENDABLE ALLOWING MODULES S ...
SBIR Phase I 1991 Department of Transportation -
USCG BUOY POSITION MONITOR
SBC: OMITRON, INC. Topic: N/ATHE OBJECT OF THIS WORK IS TO DEVELOP A PROOF OF CONCEPT PROTOTYPE BUOY POSITION MONITORING SYSTEM DESIGN WHICH WILL BE A PART OF A SINGLE UNIT INSTALLED ON A BUOY'S STRUCTURE. THIS SYSTEM INTERFACES WITH A STATUS MONITORING SYSTEM FOR COMMUNICATION OF SYSTEM PARAMETERS AND ALARMS TO REMOTE MONITORING STATIONS. THIS EFFORT WILL EVALUATE LORAN AND GPS POSITIONING SYSTEMS TO DETERMINE WHICH IS MOST ...
SBIR Phase I 1991 Department of Transportation -
OPERATOR ALERTNESS MONITORING USING THE PUPIL LIGHT REFLEX
SBC: Pulse Electronics Inc Topic: N/AA KEY FACTOR IN THE ABILITY TO SAFELY OPERATE A TRAIN IS THEOPERATOR ALERTNESS. OPERATOR ALERTNESS CAN BE COMPROMISED AS A RESULT OF FATIGUE, SUBSTANCE ABUSE OR EMOTIONAL DISTRESS. A DEVICE THAT WOULD OBJECTIVELY REPORT A PERSONS STATE OF ALERTNESS COULD INDICATE THAT PERSONS FITNESS FOR DUTY, FOR EXAMPLE, AT THE BEGINNING OF A SHIFT. IT IS WELL KNOWN THAT ALERTNESS IS HIGHLY CORRELATED WITH VARIO ...
SBIR Phase II 1991 Department of Transportation