You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Use Of Composite Materials For MCM Aft Deck Machinery

    SBC: ADVANCED PRODUCT DEVELOPMENT, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  2. Standard Low Cost Display Console

    SBC: APPLIED MATHEMATICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  3. Lead Acid Battery Sulphation Monitoring And Reduction/prevention System

    SBC: Battery Technology Center,            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  4. VTOL-UAV BASED ON THE AIRCRAFT WITH CIRCULAR ROTATING WING (ACRW) CONCEPT

    SBC: Bostan Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of DefenseNavy
  5. ANALYSIS OF E-2C LONG DURATION MISSIONS

    SBC: CHI SYSTEMS INC            Topic: N/A

    CHI Systems Inc, proposes to study the E-2C mission and to determine the conditions under which its traditional 4-5 hour duration can be extended without additional detrimental effects on aircrew performance. In Phase I we will (1) identify and assess key factors in E-2C fatigue via knowledge acquisition from current aircraft domain experts using interview, survey, and literature search, (2) make ...

    SBIR Phase I 1993 Department of DefenseNavy
  6. ANTHROPOMETRIC GUIDANCE FOR E-2C CREWSTATION REDESIGN

    SBC: CHI SYSTEMS INC            Topic: N/A

    CHI Systems proposes to develop and exercise a methodology that will enable pilot anthropometry and eye positioning data to be used to optimize the selection and placement of electronic displays in the E-2C cockpit. In Phase I we will (1) define electronic information display options and human factors issues that impact display selection and placement, (2) identify E-2C critical pilot tasks that i ...

    SBIR Phase I 1993 Department of DefenseNavy
  7. PASSIVE TMA USING ITERATED KALMAN FILTERS AND GAUSSIAN SUMS

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    DHWA PROPOSES TO DEVELOP ALGORITHMS FOR LONG-RANGE, PASSIVE TARGET MOTION ANALYSIS (TMA). THE ALGORITHMS WILL USE EXTENDED FILTERS SIMILAR TO THOSE FOUND IN CURRENT ALGORITHMS (JASA, MPKAST, AND MTST), BUT WILL UNIFY AND EXTEND THESE TECHNIQUES IN IMPORTANT WAYS. WE HOPE TO ELIMINATE MOST OF THE PROBLEMS ASSOCIATED WITH CURRENT METHODS. THE DIFFERENCES AMONG CURRENT ALGORITHMS, AND THEIR LIMITATIO ...

    SBIR Phase II 1993 Department of DefenseNavy
  8. AN INFORMATION SYSTEM FOR ECM/ESM CONTACTS

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    THE PROPOSED PROJECT IS TO DEVELOP AN INFORMATION SYSTEM FOR PROCESSING ECM/ESM CONTACT REPORTS ON BOARD A NAVY SURFACE SHIP. THE SYSTEMWILL COMBINE REPORTS FROM ORGANIC AND REMOTE (0TH) SENSORS WITH OTHER AVAILABLE INFORMATION AND WITH REASONABLE ASSUMPTIONS CONCERNING TARGET TACTICS IN ORDER TO PROVIDE INFORMATION OF VALUE TO THE MISSION COMMANDER. OUR APPROACH IS TO COMBINE TWO EXISTING SYSTEMS ...

    SBIR Phase II 1993 Department of DefenseNavy
  9. FLUCTUATION PROCESSES FOR USE IN ACOUSTIC DETECTION MODELS

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    OPERATIONS ANALYSIS OF NAVAL ENGAGEMENTS REQUIRES A MODEL FOR THE DETECTION PROCESS, AND IN PARTICULAR, FOR PASSIVE ACOUSTIC SENSORS. SUCH MODELS DEPEND IN TURN ON HAVING A MODEL FOR ACOUSTIC FLUCTUATIONS, A TERM WHICH TYPICALLY DESCRIBES ALL RESIDUAL UNCERTAINTY IN THE SONAR EQUATION COMPONENTS. THIS PROJECT WILL DEVELOP A RATIONALE FOR AN ACOUSTIC FLUCTUATION PROCESS WHICH IS A COMPOSITE OF PROC ...

    SBIR Phase II 1993 Department of DefenseNavy
  10. TACTICAL/OPERATOR AIDS

    SBC: Esscube Engineering Inc.            Topic: N/A

    THE S-3B AIRCRAFT IS THE LEAD PLATFORM FOR THE ACTIVE BLOCK UPGRADEPROGRAM FOR INTEGRATION AND UTILIZATION OF THE ERAPS AND ADAR SYSTEMS. BECAUSE OF THE QUANTITY AND COMPLEXITY OF OPERATOR CHOICES IN DEPLOYING AND USING THESE SYSTEMS, TACTICAL OPERATOR AIDS WILL BE REQUIRED FOR THE INTEGRATION AND UTILIZATION OF THESE NEW ACTIVE SYSTEMS. IN THIS PHASE I STUDY, SPECIFIC AIDS ARE TO BE IDENTIFIED FO ...

    SBIR Phase II 1993 Department of DefenseNavy
US Flag An Official Website of the United States Government