You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low CSWAP Multi-Beam TCDL Antenna System
SBC: Applied Radar, Inc. Topic: N132089Applied Radar proposes to develop a high-gain low cost, size, power and weight (low-CSWAP) tactical common data link (TCDL) antenna for the Firescout and Predator UAVs. The improved TCDL antenna will support 6 or more nodes of high-gain full-duplex communication at 21.42 MBPS in a star network configuration with 360 degree coverage out to 110 nm slant range. In Phase 1, we will design, fabricate a ...
SBIR Phase I 2014 Department of DefenseNavy -
Sensitive and Shape-Specific Molecular Identification
SBC: RYON TECHNOLOGIES, INC Topic: A11aT017The ability to rapidly detect, identify and monitor chemical agents remains a challenge of significant importance to the Armed Forces. Existing chemical sensing techniques have shortcomings that inhibit widespread implementation. To address this situation, Ryon Technologies is developing a portable instrument that is based on Rydberg Fingerprint Spectroscopy (RFS) in combination with mass spectrom ...
STTR Phase II 2014 Department of DefenseArmy -
Safe, Large-Format Lithium Ion Batteries for Aircraft
SBC: Yardney Technical Products, Inc. Topic: AF141071YTP will develop technology that provides a high performance, modular Li-ion battery with: redundant safety features, safer thin, metal case cell designs; fin/micro-channel thermal control system; and an evaporating fluid system that rapidly quenches failing cells to prevent thermal runaway and fratricide. The end goal of the proposal is making a lighter, longer lasting, less expensive, safer JSF ...
SBIR Phase I 2014 Department of DefenseAir Force -
Low-Profile, Broadband, Shear-Mode SONAR Transducer for Deep Submergence Applications
SBC: Btech Acoustics, LLC Topic: N141066BTech proposes the design and development of a low-profile, broadband, shear-mode piezocrystal acoustic transducer for deep submergence applications. The Phase I effort considers evaluation of design variants of shear mode transducers with increased pressure operation/tolerance and tradeoffs associated with the same. Design feasibility is supported with calculations of expected performance and whe ...
SBIR Phase I 2014 Department of DefenseNavy -
Acoustic Array Simulation Environment System
SBC: SOFTRONICS, LTD. Topic: N122108The proposed effort will design and build a 64 channel ASW test/training system that relays individual sonobuoy acoustic data from a master scenario generator to each randomly located/drifting relay sonobuoy. The data is retransmitted as simulated sonobuoy data for purposes of training and testing. This adds a degree of realism to test and training previously unavailable, and is a valid substitute ...
SBIR Phase II 2014 Department of DefenseNavy -
Low-Cost, High Efficiency Integration of Solid-State Lighting and Building Controls Using a Packet Energy Transfer (PET) Power Distribution System
SBC: VoltServer Topic: 03aSolid state lighting has not yet taken off in commercial buildings due to its high relative installed cost. On a normalized basis, solid state lighting replacement lamps are on the order of two times more expensive than equivalent compact fluorescent lamps (CFLs), and five times more expensive than an equivalent downlight fixture. An additional barrier relates to the performance and cost of the dr ...
SBIR Phase I 2014 Department of Energy -
Power-Dense Lightweight Hydro Turbine/Generators for 20,000+ Low-Head US Dams and Reclamation Conduits that Install In-Line,are Low Cost and Mass Producible
SBC: Amjet Turbine Systems, LLC Topic: 07bThere is a manifest need in the US and the world for renewable, lowcost energy. However, conventional and small hydropower systems for (20,000+) low head dams (550ft.) in the US tend to be extremely costintensive due to a variety of configurational issues. These include coffer dams, power houses, complex foundations, complex unit maintenance, large space requirements, and turbine technology requir ...
SBIR Phase II 2014 Department of Energy -
Multiple-stage activated-char filtration
SBC: Advanced Renewable Technology International Inc Topic: 02cLess than 1% of the worlds water is considered freshwater. Population growth and intensive use in cities and agro industrial activities threatens the depletion of this resource in many parts of the world. This depletion poses many major social and economic concerns. As a result, efforts have been made to develop economically viable technologies to make potable water from seawater or brackish water ...
STTR Phase I 2014 Department of Energy -
Reliability-Based Design Optimization Software Package for Broader Simulation-Based Design Applications
SBC: RAMDO Solutions, LLC Topic: A14075It is critical to the US Army to have reliable ground vehicles that can be relied on to demonstrate consistently high levels of performance for survivability, mobility, and durability under a wide range of operational conditions without being subject to unanticipated premature failure, and with substantially reduced maintenance requirements. In response to critical Army needs and dual use in comm ...
SBIR Phase I 2014 Department of DefenseArmy -
Multi-Band Dual-Aperture SATCOM Antenna for Rotary Wing Aircraft
SBC: Applied Radar, Inc. Topic: N141015A multi-band dual-aperture SATCOM antenna is proposed to support rotary-wing aircraft thru-rotor performance at X, Ku and Ka-bands including Ku-band TCDL as an option. Our proposed effort focuses on a low-cost design with reduced height and leverages existing aperture and radome technology from our prime contractor partner Lockheed-Martin. It also leverages existing digital modem technology develo ...
SBIR Phase I 2014 Department of DefenseNavy