You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Water Purification using TiO2 and Novel Activation Method

    SBC: Imaging Systems Technology, Inc.            Topic: A

    Under this Phase II SBIR, Imaging Systems Technology (IST) will optimize and scale up its UV Plasma- shells with Titanium (IV) Dioxide (TiO2) system to produce a low cost, rugged, lightweight, and highly efficient and versatile water purification system. Plasma-shells are tiny hollow gas encapsulating devices ranging in size from 400 microns to 8.00 mm. Under the EPA Phase I SBIR, IST has successf ...

    SBIR Phase II 2014 Environmental Protection Agency
  2. Development of Zinc Coatings on Steel by Cermaclad(TM) to Replace Pickling Lines

    SBC: MesoCoat            Topic: B

    Every year, a significant amount of money is lost due to atmospheric attack of steel parts. A convenient and effective way for corrosion protection is coating the unalloyed steel with a thin layer of zinc (Zn) metal by galvanizing. Pickling is an essential step of this process to ensure a high-quality surface of steel for further processing. In this process, acid is used to remove scale from the s ...

    SBIR Phase I 2014 Environmental Protection Agency
  3. Phosphorus Removal and Recovery From Municipal Wastewater Using Nano-Enhanced Media

    SBC: MetaMateria Technologies, LLC            Topic: A

    This Small Business Innovation Research (SBIR) Phase I project will develop approaches for the capture and recovery of phosphorus in municipal reclamation facilities processing under I MGD using an innovative nanostructured sorption media. The captured phosphorous will be recovered from the media by a simple treatment and will be converted to a useful material.Eutrophication is a process in which ...

    SBIR Phase I 2014 Environmental Protection Agency
  4. Nano-Enhanced Composite Electrodes for Electrostatic Precipitators

    SBC: Applied Sciences Inc.            Topic: TopicF

    With the increasing volatility of petroleum and natural gas resources, small coal-fired boilers have become increasingly more attractive for steam and power generation in several industries. This switch to small-scale, coal-fired plants is expected to continue, and increases the need for clean coal utilization technology. The U.S. Energy Policy Act includes support for a clean coal technology init ...

    SBIR Phase II 2010 Environmental Protection Agency
  5. Optimum Control of Induction Generators for Water Current Energy Harnessing

    SBC: Electro Standards Laboratory, Inc.            Topic: 815

    Optimization of generator performance and maximization of output power are difficult to attain in the generation of hydro-power. This is due to the changing water conditions and corresponding changes in the form of available energy. ESL proposes to use self-tuning controls in combination with a suitably chosen and optimized generator driven by hydro-energy and condition it for distribution to then ...

    SBIR Phase I 2010 Department of Commerce
  6. Performance and Design Development for Compost technology used in Green Infrastructure, Green Building, and Urban Storm Water Applications

    SBC: Filtrexx International, LLC            Topic: TopicA

    Green builders and designers, urban planners, engineers and architects, and watershed manager working with green infrastructure, low impact development (LID), storm water management, water quality improvement, total maximum daily load (TMDL) designated stream segments, and carbon footprint reduction programs need more high performance, cost-effective, green technologies to design and implement in ...

    SBIR Phase I 2010 Environmental Protection Agency
  7. Pigmented Solvent-Free Corrosion-Resistant UV Coating System

    SBC: DR BEN CURATOLO INC            Topic: TopicB

    This SBIR Phase I project is designed to determine the feasibility of preparing novel coatings for corrosion resistance through the incorporation of pigment and non-chrome corrosion inhibitor into a solvent-free ultraviolet (UV) light curable matrix. In particular, the proposed research is directed toward determining the feasibility of preparing a safe, novel chromium-free, solvent-free, corrosion ...

    SBIR Phase I 2010 Environmental Protection Agency
  8. Chromium-Free Corrosion-Resistant Hybrid UV Coatings

    SBC: DR BEN CURATOLO INC            Topic: TopicA

    This SBIR Phase II project is designed to develop and optimize a prototype environmentally friendly, chromium-free, corrosion-resistant, hybrid ultraviolet (UV) coating system with demonstrated properties suitable for industrial, automotive, and aerospace corrosion protection. The objectives of this Phase II project include the optimization of individual formulation components in the development o ...

    SBIR Phase II 2010 Environmental Protection Agency
  9. Development of an In Situ Thermal Extraction Detection System (TEDS) for Rapid, Accurate, Quantitative Analysis of Environmental Pollutants in the Subsurface

    SBC: Ion Signature Technology, Inc.            Topic: TopicH

    The U.S. Environmental Protection Agency (EPA) in its publication Technology News and Trends in 2009 featured the Navy's work that saved 6 years and $3 million delineating chlorinated solvent plumes in soil and groundwater. The Navy used EPA's TRIAD process, which incorporates systematic planning, field analytics, and dynamic work strategies, during its hazardous waste site investigation. A direct ...

    SBIR Phase II 2010 Environmental Protection Agency
  10. Performance and Design Development for Compost Technology used in Green Infrastructure, Green Building, and Urban Storm Water Applications

    SBC: Filtrexx International, LLC            Topic: 09NCERA1

    Green builders and designers, urban planners, engineers and architects, and watershed manager working with green infrastructure, low impact development (LID), storm water management, water quality improvement, total maximum daily load (TMDL) designated stream segments, and carbon footprint reduction programs need more high performance, cost-effective, green technologies to design and implement in ...

    SBIR Phase I 2010 Environmental Protection Agency
US Flag An Official Website of the United States Government