You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Innovative Designs for Reliable Electro-Explosive Ordnance Devices

    SBC: SEACORP, LLC            Topic: MDA12031

    Missiles, use electro-explosive devices (EEDs) to perform mulitple functions during operation. This effort seeks ways to improve on the EED"s reliability and lower the failure or inadvertent activation rate of these devices. During Phase I, SEA CORP investigated replacing EEDs with commercial off the shelf (COTS) automotive airbag inflators to perform the required pneumatic functions of variou ...

    SBIR Phase II 2014 Department of DefenseMissile Defense Agency
  2. Software Defined Wideband DREX Receiver

    SBC: Applied Radar, Inc.            Topic: MDA09T003

    To realize next generation missile defense radar systems with a significant improvement in performance requires more cost effective system implementations. Software defined radar (SDR) technologies together with field programmable gate array (FPGA) implementations promise reusable and low cost DREX multichannel receivers in smaller form factors. Real time firmware reconfiguration enables radar mod ...

    STTR Phase I 2010 Department of DefenseMissile Defense Agency
  3. Open System Manufacturing of Large Sensing/Weapons Platforms

    SBC: Applied Radar, Inc.            Topic: SB102005

    In order to maintain our nation’s technological superiority on air, sea and land, we must respond quicker to emerging threats and reduce the cost of major sensing platforms. Every DoD platform developed nowadays contains at least one sensor, whether it be RF, EO/IR, or acoustic. In fact, in a lot of recent developments, the platform is built around the sensor and exists only to support the senso ...

    SBIR Phase I 2010 Department of DefenseDefense Advanced Research Projects Agency
  4. Optimum Control of Induction Generators for Water Current Energy Harnessing

    SBC: Electro Standards Laboratory, Inc.            Topic: 815

    Optimization of generator performance and maximization of output power are difficult to attain in the generation of hydro-power. This is due to the changing water conditions and corresponding changes in the form of available energy. ESL proposes to use self-tuning controls in combination with a suitably chosen and optimized generator driven by hydro-energy and condition it for distribution to then ...

    SBIR Phase I 2010 Department of Commerce
  5. Innovative Approaches to Low Power, Sub-Threshold Electronic Circuits

    SBC: CAMGIAN MICROSYSTEMS CORP            Topic: SB082045

    This program proposes to demonstrate an ultra-low power design methodology and circuits for digital logic employing advanced dynamic voltage scaling (DVS) for asynchronous NULL Convention Logic (NCL) circuits operating in sub-threshold to super-threshold voltage regimes. The power supply voltages of logic block partitions will be independently set by on-chip voltage controllers based on the data p ...

    SBIR Phase II 2010 Department of DefenseDefense Advanced Research Projects Agency
  6. SEA WATER BATTERIES

    SBC: Stam Inc.            Topic: N/A

    N/A

    SBIR Phase I 1983 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government