Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. SIGMA: Speedy Imagery Geo-registration and Motion Analysis

    SBC: VISION SYSTEMS INC.            Topic: AF131151

    ABSTRACT: VSI proposes the development of the SIGMA (Speedy Imagery Geo-registration and Motion Analysis) system, which will address three key requirements by the end of Phase II: (i) adapt to different type of sensors, sensor-configurations and sensor operating conditions, (ii) handle large amount of data in real-time or close to real-time using limited resources, and (iii) operate under conditi ...

    SBIR Phase II 2015 Department of DefenseAir Force
  2. Wideband Sub-Array Digital Receiver Exciter (DREX)

    SBC: Applied Radar, Inc.            Topic: MDA08028

    Applied Radar has developed a multi-channel wideband digital receiver/exciter (DREX) module denoted as the Single Channel Open Architecture Receiver Exciter (SCORE-X750) which operates at X-band (tunable over 812 GHz) with 750 MHz of instantaneous bandwidth. This DREX module is designed for ground-based radars and can be used in new designs or in retrofit and modernization of existing radars. The ...

    SBIR Phase II 2015 Department of DefenseMissile Defense Agency
  3. Safe, Large-Format Lithium Ion Batteries for Aircraft

    SBC: Yardney Technical Products, Inc.            Topic: AF141071

    YTP will develop technology that provides a high performance, modular Li-ion battery with: redundant safety features, safer thin, metal case cell designs; fin/micro-channel thermal control system; and an evaporating fluid system that rapidly quenches failing cells to prevent thermal runaway and fratricide. The end goal of the proposal is making a lighter, longer lasting, less expensive, safer JSF ...

    SBIR Phase I 2014 Department of DefenseAir Force
  4. Innovative Designs for Reliable Electro-Explosive Ordnance Devices

    SBC: SYSTEMS ENGINEERING ASSOCIATES CORPORATION            Topic: MDA12031

    Missiles, use electro-explosive devices (EEDs) to perform mulitple functions during operation. This effort seeks ways to improve on the EED"s reliability and lower the failure or inadvertent activation rate of these devices. During Phase I, SEA CORP investigated replacing EEDs with commercial off the shelf (COTS) automotive airbag inflators to perform the required pneumatic functions of variou ...

    SBIR Phase II 2014 Department of DefenseMissile Defense Agency
  5. THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS.

    SBC: Aquidneck Management Associate            Topic: N/A

    THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS. THE RESEARCH WILL ADDRESS ALL FACTORS THAT AFFECT SOFTWARE COSTS FROM A FUNCTIONAL STANDPOINT AS OPPOSED TO THE TRADITIONAL LINES-OF-CODE (PROGRAM SIZE) APPROACH. THE FACTORS WILL BE TRANSLATED INTO A MODEL THAT EMPHASIZES THE IMPORTANCE OF IN ...

    SBIR Phase I 1983 Department of DefenseAir Force
US Flag An Official Website of the United States Government