You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Safe, Large-Format Lithium Ion Batteries for Aircraft

    SBC: Yardney Technical Products, Inc.            Topic: AF141071

    YTP will develop technology that provides a high performance, modular Li-ion battery with: redundant safety features, safer thin, metal case cell designs; fin/micro-channel thermal control system; and an evaporating fluid system that rapidly quenches failing cells to prevent thermal runaway and fratricide. The end goal of the proposal is making a lighter, longer lasting, less expensive, safer JSF ...

    SBIR Phase I 2014 Department of DefenseAir Force
  2. THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS.

    SBC: Aquidneck Management Associate            Topic: N/A

    THE RESEARCH HEREIN PROPOSED IS INTENDED TO ADDRESS THE CONTINUING PROBLEM OF ESTIMATING SOFTWARE COSTS OVER THE LIFE OF LARGE AND COMPLEX SOFTWARE PROJETS. THE RESEARCH WILL ADDRESS ALL FACTORS THAT AFFECT SOFTWARE COSTS FROM A FUNCTIONAL STANDPOINT AS OPPOSED TO THE TRADITIONAL LINES-OF-CODE (PROGRAM SIZE) APPROACH. THE FACTORS WILL BE TRANSLATED INTO A MODEL THAT EMPHASIZES THE IMPORTANCE OF IN ...

    SBIR Phase I 1983 Department of DefenseAir Force
US Flag An Official Website of the United States Government