You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Gamma-Heated In-Core Thermoacoustic Sensor

    SBC: Btech Acoustics, LLC            Topic: 30a

    We will develop an acoustically-telemetered, frequency-multiplexed, gamma-heated thermoacoustic sensors that can simultaneously monitor local gamma flux and coolant temperature at multiple locations in the core of an operating commercial nuclear reactor. These sensors will require no external power source and will telemeter temperature encoded as the frequency of the sound radiated by the sensor a ...

    SBIR Phase I 2018 Department of Energy
  2. Development of a Wind Turbine Blade Surface Coating to Reduce Damage due to Lightning

    SBC: AQUANIS, INC.            Topic: 14b

    Lightning strikes and near-strikes on wind turbine blades cost wind farm operators millions of dollars every year, representing one of their largest O&M risks and expenses, as well as a primary cause of turbine downtime (resulting in lost power production). These negative effects increase the levelized cost of wind energy. With the incidence of lightning strikes increasing as turbines get larger, ...

    SBIR Phase I 2018 Department of Energy
  3. Developing BEM Applications for the Reinsurance Industry

    SBC: Prisere Llc            Topic: 09c

    Inefficient use of energy wastes capital that could be more productively invested in other segments of the U.S. economy. At the same time, the reinsurance industry is eager to reduce property losses arising from increasingly severe weather. But existing reinsurance loss models do not take into consideration the resiliency benefits of energy efficiency measures. The objective of the Phase I SBIR re ...

    SBIR Phase I 2018 Department of Energy
  4. Low-Cost, High Efficiency Integration of Solid-State Lighting and Building Controls Using a Packet Energy Transfer (PET) Power Distribution System

    SBC: VoltServer            Topic: 03a

    Solid state lighting has not yet taken off in commercial buildings due to its high relative installed cost. On a normalized basis, solid state lighting replacement lamps are on the order of two times more expensive than equivalent compact fluorescent lamps (CFLs), and five times more expensive than an equivalent downlight fixture. An additional barrier relates to the performance and cost of the dr ...

    SBIR Phase I 2014 Department of Energy
US Flag An Official Website of the United States Government