You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Regenerable, heat-Abating, humidity-Neutralizing, Carbon diOxide Removal System (RANCOR) Phase II
SBC: PARAGON SPACE DEVELOPMENT CORPORATION Topic: CBD12106In Phase I RANCOR successfully demonstrated an innovative enabling humidity control technology to provide very low humidity air to water sensitive, fully reusable CO2 adsorbents. The use of adsorbents enables complete reusability/rechargability and reduces the total heat load on the SCBA to the point where ice or other cooling systems will no longer be required. In Phase II Paragon will introduce ...
SBIR Phase II 2014 Department of DefenseOffice for Chemical and Biological Defense