You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Commercializing the Effective K-3 Assessment to Instruction (A2i) Intervention to Reduce Cost and to Scale Access to the Benefit of More Students
SBC: Learning Ovations, Inc. Topic: N/APurpose: Students who fail to achieve proficient levels of literacy are at increased risk for grade retention, referral to special education, and dropping out of high school. The kindergarten through 3rd grade years are particularly important for students to gain a strong foundation in reading as those who continue to struggle with reading are significantly less likely to achieve reading proficien ...
SBIR Phase I 2014 Department of Education -
Commercializing the Effective K-3 Assessment to Instruction (A2i) Intervention to Reduce Cost and to Scale Access to the Benefit of More Students
SBC: Learning Ovations, Inc. Topic: N/APurpose: Students who fail to achieve proficient levels of literacy are at increased risk for grade retention, referral to special education, and dropping out of high school. The kindergarten through 3rd grade years are particularly important for students to gain a strong foundation in reading as those who continue to struggle with reading are significantly less likely to achieve reading proficien ...
SBIR Phase II 2014 Department of Education -
Increasing Mobility Through Advanced Power Sources for Assisted Mobility Devices
SBC: LYNNTECH INC. Topic: N/AThe project develops a high-capacity hydrogen storage system for a fuel cell/battery hybrid power supply for electric wheelchairs and scooters. The light-weight, rugged, simple to recharge, and environmentally friendly system is fabricated to deliver over 1.2kW of peakpower and optimize for an average power use of 430 W, weigh 20 kg, and deliver 12,000 Watt hours of energy, equivalent to over 28 ...
SBIR Phase II 2006 Department of Education -
Wireless EMG and Improved Mounting System
SBC: MOTION CONTROL, INC Topic: N/AThe project focuses on the development of a small, water-proof elecromyographic (EMG) sensor for a myoelectric arm prosthesis that transmits by a wireless link and can be easily and consistently installed over any muscle site. The wireless link eliminates wires and connectors inside the arm socket that can be bulky and unreliable due to corrosion and breakage of wires representing a significant i ...
SBIR Phase I 2006 Department of Education -
Wireless EMG Preamp and Improved Mounting System
SBC: MOTION CONTROL, INC Topic: N/ADevelops a small waterproof Warless EMG Preamp sensor for myoelectric arm prostheses that transmits a digital signal via a wireless link eliminating many of the wires and connectors associated with arm prostheses and allowing connection to modern rollon gel type liners
SBIR Phase I 2006 Department of Education -
Lightweight, durable, adjustable composite backrest
SBC: ACCESSIBLE DESIGNS, INC. Topic: N/AWe have designed a lightweight, sturdy, user adjustable ergonomically designed backrest support for ultralight weight wheelchairs that will provide necessary postural support and provide a variety of positions to ease dressing, propulsion, and seated comfort. The backrest will improve user comfort, function, and posture during multiple activities of daily living. The innovative design will enable ...
SBIR Phase I 2004 Department of Education -
Low Cost, High Resolution, Pressue Mapping System for the Prevention of Pressure Ulcers
SBC: EM PHOTONICS INC Topic: N/APressure ulcers are a serious medical problem with annual treatment costs over $1 billion dollars. While the exact etiology involves a complex combination of factors, it is generally accepted that prolonged pressure to soft tissues results in discrete areas of acute ischemia. If the pressure is not relieved and the blood supply restored in a critical length of time, endothelial cell damage will re ...
SBIR Phase I 2004 Department of Education -
Low Cost, High Resolution, Pressue Mapping System for the Prevention of Pressure Ulcers
SBC: EM PHOTONICS INC Topic: N/APressure ulcers are a serious medical problem with annual treatment costs over $1 billion dollars. While the exact etiology involves a complex combination of factors, it is generally accepted that prolonged pressure to soft tissues results in discrete areas of acute ischemia. If the pressure is not relieved and the blood supply restored in a critical length of time, endothelial cell damage will re ...
SBIR Phase II 2004 Department of Education -
Project PREPARE: Preparing preschoolers and kindergartners who are deaf to learn to read by teaching them early critical service words typically visually and linguistically inaccessible to them through a computer-based instruction product
SBC: HOPE, Inc. Topic: N/AChildren with significant hearing loss continually exhibit low reading levels, due in part to the difficulty they face upon entering school of understanding basal reading vocabulary, especially early critical “service words.” Service words are those words that cannot be learned through the use of pictures or objects (e.g., apple) but that constitute up to 75% of all words used in basal readers ...
SBIR Phase I 2004 Department of Education -
Development of a Nemeth Math to Latex Backtranslator System
SBC: Logical Software Solutions Topic: N/AThe project extends and enhances the prototype developed in Phase 1 to obtain a reliable, robust, and complete software environment for backtranslating mathematical documents (containing mathematical expressions coded in Nemeth Math code and regular text coded in ASCII Grade 2 Braille) to Latex. The project is conducting research on: (1) automatic detection and recovery from errors in the Math d ...
SBIR Phase I 2004 Department of Education