You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Printed Low Voltage Munition Ignition Bridge
SBC: Blue Sky Engineering, Inc. Topic: A14059Advances in printing technologies may enable low-cost and flexible fabrication options for ignition bridges. The inherent nature of these direct write systems enables quick-turn prototyping for laboratory-scale development, while their high throughput allows low-cost production. The Blue Sky Engineering team proposes to develop printed explosive bridges based on its expertise in microdetonators ...
SBIR Phase I 2014 Department of DefenseArmy -
SBIR Phase I: Dynamic Mode Adjustment Between High Performance and Power Saving States
SBC: PACKET DIGITAL LLC Topic: EIThis Small Business Innovation Research (SBIR) Phase I project will research, design and demonstrate a new technique for dynamically controlling the operating mode for DRAM devices. Today memory is set to the highest performance and highest power mode at boot regardless of usage, an antiquated approach creating thermal hotspots and wasting power. The intellectual merit is a combination of both fre ...
SBIR Phase I 2014 National Science Foundation -
UNIQUE APPLICATIONS FOR ARTIFICIAL NEURAL NETWORKS
SBC: In-march Inc Topic: N/ATHE INVESTIGATION HAS THE FOLLOWING OBJECTIVES: 1. ESTABLISH THAT MODULAR NEURAL NETWORKS, WORKING SYNERGISTICALLY WITH GENETIC SEARCH, PROVIDE A UNIQUELY POWERFUL MEANS OF INTELLIGENTLY CONTROLLING HEURISTIC MATHEMATICAL ALGORITHMS FOR LARGE-SCALE VEHICLE ROUTING AND SCHEDULING PROBLEMS. THE DESIGN LENDS ITSELF NATURALLY TO PARALLEL COMPUTING ON COMPUTING NETWORKS. 2. CODE A PROTOTYPE SYSTEM USIN ...
SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency -
AUTOMATED MIXING AND APPLICATION OF AGRICULTURAL CHEMICALS
SBC: Mais Inc Topic: N/ACURRENT METHODS FOR APPLYING AGRICULTURAL CHEMICALS, SUCH AS FERTILIZERS, HERBICIDES, AND PESTICIES, REQUIRE PREMIXING OF CONCENTRATED CHEMICALS WITH WATER AND POSE PROBLEMS OF DISPOSING OF THE UNUSED MIXED CHEMICALS AND THE PREMIX TANK WASH SOLUTION IN AN ENVIRONMENTALLY ACCEPTABLE MANNER. IN ADDITION, CURRENT SPRAYERS CANNOT ADJUST CONCENTRATIONS FOR CHANGES IN SPRAYER SPEED. THE OBJECTIVE OF MA ...
SBIR Phase I 1990 Environmental Protection Agency