You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Island-mode Enhancement Strategies and Methodologies for Defense Critical Infrastructure
SBC: PC KRAUSE & ASSOCIATES INC Topic: DTRA152006An electromagnetic pulse (EMP) attack could cause widespread outage of the commercial electric power system that could last for weeks to months. Microgrids for defense critical infrastructure (DCI) should thus be equipped to operate in islanded mode for extended periods of time using only local fuel storage and renewable energy sources. The primary difference between operating a microgrid in islan ...
SBIR Phase I 2016 Department of DefenseDefense Threat Reduction Agency -
Fully Metallic Self-Fragmenting Structural Reactive Materials Using Composites and Alloys Comprised of Aluminum, Lithium, and Magnesium
SBC: Adranos Energetics LLC Topic: DTRA16A002While aluminum casing materials provide some enhanced performance and thermal loading to explosive ordinance, their overall effectiveness is highly limited by incomplete combustion and long residence times. In order to reduce these problems, the casing material must be designed to facilitate rapid fragmentation through either specialized casing geometries or greatly refined initial particle sizes. ...
STTR Phase I 2016 Department of DefenseDefense Threat Reduction Agency