You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DESIGN STUDY FOR A REDUCED ENERGY AND SIZE, PULSED DEUTERON ACCELERATOR FOR USE IN A PFNA EXPLOSIVES DETECTION SYSTEM.

    SBC: National Electrostatics Corp.            Topic: N/A

    A PROTOTYPE FOR AN EXPLOSIVE DETECTION SYSTEM USING PULSED FAST NEUTRON ACTIVATION (PFNA) TECHNIQUES USES AN ELECTROSTATIC TANDEM ACCELERATOR TO PRODUCE NANOSECOND WIDTH PULSES OF 6 MEV DEUTERONS. WHILE THIS APPROACH ALLOWS ONE TO PRODUCE NEUTRONS OF AN ENERGY SUITED TO THE REACTION ONE HOPES TO EXCITE IN SAMPLE ATOMS OF INTEREST, IT REQUIRES THE USE OF A FAIRLY LARGE AND EXPENSIVE ACCELERATOR SYS ...

    SBIR Phase I 1993 Department of Transportation
US Flag An Official Website of the United States Government