You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Compact, High Pulse Rate, Mid-Infrared laser
SBC: Aculight Corporation Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseNavy -
CW Mid-Infrared Tandem OPO Source
SBC: Aculight Corporation Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseAir Force -
Integration of III-V Semiconductor Optical Sources with Electro-optic Polymer Waveguide Devices Using Micromachined Reflective Elements
SBC: Aegis Technologies Group, LLC, The Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseArmy -
Dev and Validation of a Prototype Field-Portable Intrinsic Bioremediation Test Kit with Data Analysis Software Pkg
SBC: Agi Technologies Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseAir Force -
Phase Signature Antenna Drive Diagnostics System
SBC: AI Signal Research, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseArmy -
6-DOF Isolation and Excitation Facility
SBC: Amtec Corporation Topic: N/AThis sponsoring agency has defined the need for a six degree-or-freedom (6DOF) magnetically levitated (maglev) test platform to be used for vibration analysis. The intended payload can range in mass from 1Kg to 1000kg and i size up to one meter by one meter at the base. Peak linear acceleration of 5 g's and strokes of 25 mm (peak-peak) are required. The platform should also be capable of simult ...
SBIR Phase I 1996 Department of DefenseArmy -
Optical Delay Line Loop Sampler for Multichannel Very Short Single Shot Transient Signals
SBC: Beam Diagnostics Lab, Inc. Topic: N/A40368 Beam Diagnostics Lab, Inc. Existing and proposed particle accelerators used in basic research experiments need to record fast moving particles coming from many directions. This project will develop a multi-channel optical measurement system which provides all observation data to a single oscilloscope. The technique utilizes the wide frequency band of a single mode optical fiber. It uses ...
SBIR Phase I 1996 Department of Energy -
Search For Mobile And Relocatable Targets (SMART)
SBC: BONN CORP. Topic: N/ABONN Corporation (BONN) has chosen to concentrate on a methodology that computes an optimal target search in near-real-time, with the capability of accommodating user-definable optimality based upon time / pathlength, probability of target detection target value, and survivability in a dense threat environment. This methodology will be extensible to address multiple airborne platforms and multipl ...
SBIR Phase I 1996 Department of DefenseNavy -
Lightweight Small 3-10 kw, 120 Vac, 60 Hz, Diesel Generator Sets
SBC: Centrair Corp Topic: N/AObjective is to develop the preliminary design and existing component modification required to integrate a 3-10 kw generator assembly using the newly patented new bold Turbo Rotary Powered Diesel Engine with a VSCF alternator that will have minimal 3 kw, 120 Vac, 50/60 Hz, 3 Phase power output up to 10 Kw, 120 Vac, 50/60 Hz, 3 phase output (depending ont he load requirement) in a lightweight compo ...
SBIR Phase I 1996 Department of DefenseArmy -
Low Cost, High Pressure, Electric Metering Centrifugal Pump for Liquid Fueled, Expendable, Tactical Missile Propulsion Systems
SBC: CFD RESEARCH CORPORATION Topic: N/AAn electrically driven high head rise centrifugal pump is proposed. Ongoing component technology development indicates this system will be required to meet next generation expendable Air-Turbo-Ramjet (ATR), Liquid Fuel RamJet (LFRJ) and turboJet missile propulsion engine requirements. During Phae I CFDRC will collaborate with Northern Research Engineering to: 1. design and fabricate a prototype ...
SBIR Phase I 1996 Department of DefenseArmy