You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Design, Manufacture, and Test of an Underwater Acoustic Intensity Probe

    SBC: Acoustech Corporation            Topic: N/A

    The Acoustech Corporation as the prime contractor and the Pennsylvania State University - Applied Research Labc-atory as the subcontractor propose to design, manufacture, and test an underwater acoustic intensity probe containing a geophone and two-hydrophones encased in a neutrally buoyant package. The results of this proposed effort are anticipated to be highly successful since the researc ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Compact, High Pulse Rate, Mid-Infrared laser

    SBC: Aculight Corporation            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  3. CW Mid-Infrared Tandem OPO Source

    SBC: Aculight Corporation            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  4. Adhesive Bond Integrity of Composites

    SBC: Adler Consultants, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  5. Integrated Micromachined Angular Rate Sensor

    SBC: ADVANCED MICROMACHINES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  6. Dev and Validation of a Prototype Field-Portable Intrinsic Bioremediation Test Kit with Data Analysis Software Pkg

    SBC: Agi Technologies            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  7. Development of Time-Domain Planar Near-Field Scanning Measurement Techniques

    SBC: ANALYTIC DESIGNS INC            Topic: N/A

    Near-field frequency domain meaasurements of antennas over a planar aperture are commonly used to obtain far-field patterns. This technique has now bben formulation in the time domain, which is very desirable for short pulse signals. An additional benefit, particularly significant for antennas with low-sidelobes, arises from time domain measurements in that edge effects of a finite a ...

    SBIR Phase I 1996 Department of DefenseAir Force
  8. Focused Application Software for Design of Ferrite Patch Antennas

    SBC: ANSOFT CORP.            Topic: N/A

    Currently, most antenna array designs are mechanically steered. However, as demand for higher performance antennas increases, an electronic replacement for the mechanical system becomes necessary. An alternative that may prove to be more cost effective is to use ferrite patch antennas as the elements in the array. The antenna's radiation characteristics are controlled by the direction and magni ...

    SBIR Phase I 1996 Department of DefenseAir Force
  9. Solid State Neutron Detector

    SBC: Applied Sciences Inc.            Topic: N/A

    Phase I proposes to demonstrate an easy-to-operate, inexpensive room temperature neutron detector based on boron-doped diamond. The detector would produce an immediate signal related to low-level neutron irradiation. The concept exploits the high neutron absorption cross section of B-10, which results in excellent sensitivity. The charge carriers generated in the diamond by a neutron absorption ev ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  10. An Autonomous Self-Propelled System for Hard Rock Drilling

    SBC: Aps Technology, Inc.            Topic: N/A

    40457 APS Technology Several advancements are needed to improve the efficiency and accuracy of hard rock drilling. Of particular interest are bottomhole assemblies (BHAs) which can grip the borehole wall in order to provide a platform from which torque and compressive force can be applied to the bit and the direction of drilling can be continuously monitored and controlled. This project will d ...

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government