You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. New Composite Manufactuing Processes for Special Operation Forces Maritime Craft Hulls

    SBC: SEEMANN COMPOSITES, INC.            Topic: N/A

    Seemann Composites, Inc. (SCI), as the prime contractor, Materials Science Corporation (MSC) and McDonnell Douglas Phantom Works as subcontractors, propose to develop an advanced composite structure which will be significantly lighter, tougher and more reliable than previous hull structures and which can be built at a lower cost than conventional construction. Furthermore, problems with quality ...

    SBIR Phase I 1996 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government