You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NOAA WEATHER WIRE SERVICE (NWWS) MONITORING

    SBC: Advanced Communication            Topic: N/A

    ACS PROPOSES TO DEVELOP A REAL TIME NWWS PERFORMANCE MONITORING CAPABILITY UTILIZING A 386 PERSONAL COMPUTER, MICROSOFT WINDOWS, AND AN OFF-THE-SHELF SERIAL INTERFACE BOARD. THE ACS DEVELOPED WEATHER WIRE AUTOMATIC MONITORING SYSTEM (WWAMS) WILL PROVIDE THE FOLLOWING FEATURES: A. REAL TIME PERFORMANCE MONITORING, QUALITY CHECKING, REPORT GENERATION, AND USER INTERFACE; B. COLOR, MENU DRIVEN, USER- ...

    SBIR Phase I 1991 Department of Commerce
  2. CROSS-CORRELATION OPTICAL STRAIN SENSOR FOR WIND TUNNEL TEST INSTRUMENTATION

    SBC: American Research Corporation of Virginia            Topic: N/A

    AEROSPACE STRUCTURES/MODELS ARE SUBJECTED TO HIGH TEMPERATURES AND STRONG AERODYNAMIC FORCES UNDER CAREFULLY CONTROLLED ENVIRONMENTAL CONDITIONS DURING INSTRUMENTED LABORATORY TESTING. WIND TUNNEL TESTING REQUIRES INSTRUMENTATION WHICH IS RUGGED, RELIABLE, ACCURATE AND PROVIDES TEST DATA QUICKLY TO THE TEST OPERATOR. MEASUREMENTS OF STATIC AND DYNAMIC STRAINS AND PROOF TESTING ON AEROSPACE STRUCTU ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  3. FLIGHT INSTRUMENTATION FOR SIMULTANEOUS DETECTION OF FLOW SEPARATION & TRANSITION

    SBC: ANALYTICAL SERVICES & MATERIALS INC            Topic: N/A

    A PORTABLE DATA ACQUISITION AND INSTRUMENTATION SYSTEM (DAISY) HAS BEEN DEVELOPED BY AS&M, INC. FOR WIND-TUNNEL TESTS. IT INCORPORATES A UNIQUE AND PATENTED TECHNIQUE TO ACCURATELY IDENTIFY AND DEMARCATE REGIONS OF FLOW SEPARATION, REATTACHMENT, AND THE LEADING-EDGE STAGNATION POINT. SIMULTANEOUSLY, LAMINAR-TO-TURBULENT TRANSITION AND THE SPECTRAL CONTENT OF THE MOST AMPLIFIED DISTURBANCES IN THE ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  4. FUEL CELL PROPULSION SYSTEM FOR A HIGH ALTITUDE RESEARCH PLATFORM

    SBC: AURORA FLIGHT SCIENCES CORPORATION            Topic: N/A

    THE INNOVATION PROPOSED FOR DEVELOPMENT IS A FUEL-CELL BASED ELECTRIC PROPULSION SYSTEM FOR VERY HIGH-ALTITUDE AIRCRAFT. THIS SYSTEM WOULD POTENTIALLY BE CAPABLE OF REACHING ALTITUDES OF UP TO 40 KM (131,000 FT) WITH A SCIENTIFIC PAYLOAD IN EXCESS OF 450 KG (1000 LBS). IT WOULDBE AN ATTRACTIVE PROPULSION ALTERNATIVE FOR NASA'S PROPOSED HIGH ALTITUDE RESEARCH PLATFORM (HARP) OR OTHER VERY HIGH ALTI ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  5. ADAPTIVE NONLINEAR POLYNOMIAL NETWORKS FOR ROTORCRAFT CABIN NOISE REDUCTION

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    TO REDUCE ROTORCRAFT-CABIN NOISE AND VIBRATION VIA ACTIVE ANTI-SOUND TECHNIQUES THIS PROJECT INVESTIGATES ADAPTIVE, NONLINEAR, POLYNOMIAL NETWORK-PREDICTION AND NOISE-CANCELLATION ALGORITHMS. IN RECENT YEARS, THERE HAS BEEN A CONSIDERABLE AMOUNT OF WORK ON THE USE OF STATISTICA SIGNAL-PROCESSING TECHNIQUES TO PRODUCE ANTI-SOUND ACOUSTIC FIELDS FOR REDUCING VIBRATION AND NOISE IN ENCLOSED SPACES. T ...

    SBIR Phase I 1991 National Aeronautics and Space Administration
  6. WAVELENGTH DIPLEXED, FIBER COUPLED, COHERENT LASER RADAR MEASUREMENT SYSTEM

    SBC: DIGITAL SIGNAL CORP.            Topic: N/A

    THERE IS A NEED FOR FIBER COUPLED PROXIMITY SENSORS WITH HIGH SPEED AND ACCURACY FOR APPLICATIONS TO ROBOTIC END EFFECTORS AND TO AUTOMATED INSPECTION AND QUALITY CONTROL. THE PROPOSED PHASE I EFFORT WILL DEMONSTRATE A NOVEL, ROBUST, INTEGRATED SENSOR CONCEPT WITH MULTIPLE SENSOR CAPABILITY. FIBER OPTIC SENSORS HAVE BEEN DEMONSTRATED TO HAVE GEOMETRIC FLEXIBILITY. IN THE CASE OF PHASE MODULATED IN ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  7. AUTOMATED OPERATIONS AND MAINTENANCE INSTRUCTIONS SYSTEM

    SBC: ENSCO Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  8. Full-Chord Laminar Flow for GA Aircraft Wings with a Limited Suction

    SBC: Innovative Aerodynamic            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  9. DUAL K AND C BAND TRANSPONDER FOR SATELLITE ALTIMETRIC CALIBRATION

    SBC: Interferometrics, Inc.            Topic: N/A

    WE PROPOSE TO INVESTIGATE TECHNIQUES TO MAKE A DUAL FREQUENCY (K-BAND AND C-BAND) TRANSPONDER THAT WILL SIMULATE THE SAME SURFACE REFLECTION OF RANGING PULSES TRANSMITTED FROM THE TOPEX/POSEIDON SPACECRAFT. THUS, THE TRANSPONDER MUST RECEIVE AND TRANSMIT ON THE SAME FREQUENCIES. THEREFORE, IT MUST RECEIVE THE SPACECRAFT TRANSMISSIONS AND DETERMINE THEIR CHARACTERISTICS, IN ORDER TO TRANSMIT REPLIC ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  10. OPTIMIZATION OF LARGE STRUCTURES IN A MASSIVELY PARALLEL ENVIRONMENT

    SBC: Mrj Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government