You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NANOMETER-SIZE STEP HEIGHT TEST STRUCTURES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    MCNC PROPOSES A FEASIBILITY STUDY AND EVALUATION OF THREE PROMISING APPROACHES TO THE FABRICATION OF SURFACE TEST STRUCTURES ON SILICON. SURFACE FEATURES ON THE FIRST STRUCTURE WILL BE PRODUCED BY CONTROLLABLY ETCHING THERMALLYGROWN OXIDES. FEATURES ON THE SECOND WILL BE MADE BY ETCHING PIEZOELECTRIC THIN FILMS. USING THE PIEZOELECTRIC FILM AS PART OF A CAPACITOR, STEP-HEIGHT CAN BE VARIED AND PRO ...

    SBIR Phase I 1992 Department of Commerce
  2. DEMONSTRABLY CORRECT COMPILATION (DCC)

    SBC: Baldwin/mchugh Assoc., Inc.            Topic: N/A

    A TECHNIQUE FOR OBTAINING TRUSTWORTHY COMPILATION BASED ON A COMPILATION CHECKER (SIMILAR TO A PROOF CHECKER) IS PROPOSED. THE TRANSFORMATIONS USED IN A COMPILER WILL BE FORMALLY SPECIFIED AND VERIFIED USING INTERPRETER EQUIVALENCE METHODS. THE COMPILER WILL BE INSTRUMENTED TO PRODUCE A TRACE OF THE TRANSFORMATIONS APPLIED IN THE COMPILATION OF A GIVEN PROGRAM. THE COMPILATION CHECKER WILL VALIDAT ...

    SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency
  3. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  4. HYBRID DIFFRACTIVE/REFRACTIVE RELAY SYSTEM FOR HEAD MOUNTED DISPLAYS

    SBC: DIGITAL OPTICS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency
  5. IN-SITU MANUFACTURING CONTROL BY ELLIPSOMETRY

    SBC: Woollam J A Co            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  6. NON-INVASIVE CONTROL OF II-VI SEMICONDUCTOR GROWTH

    SBC: Woollam J A Co            Topic: N/A

    N/A

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  7. DIGESTIVE ENZYME SUPPLEMENTS TO INERT FEEDS FOR SMALL-EGG FISH LARVAE

    SBC: International Aquaculture Res            Topic: N/A

    INADEQUATE STARTER FEEDS SEVERELY HOLD BACK NEW AQUACULTURE ENTERPRISES SUCH AS PRESENT ATTEMPTS TO RAISE FISHES WHOSE LARVAE DEVELOP FROM SMALL EGGS AND HAVE VERY "DIFFICULT" FOOD REQUIREMENTS. INERT LARVAL FEEDS HAVE NOT SUCCESSFULLYELIMINATED THE STRICT DEPENDENCY ON NATURAL FORAGE DURING THE CRITICAL POST-LARVAL STAGE AFTER YOLK ABSORPTION AND BEFORE THE DEVELOPMENT OF A DIGESTIVE SYSTEM WITH ...

    SBIR Phase I 1987 Department of Commerce
  8. MONOLAYER RESOLUTION CHARACTERIZATION BY VARIABLE ANGLE SPECTROSCOPIC ELLIPSOMETRY (VASE)

    SBC: Woollam J A Co            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government