Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. NANOMETER-SIZE STEP HEIGHT TEST STRUCTURES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    MCNC PROPOSES A FEASIBILITY STUDY AND EVALUATION OF THREE PROMISING APPROACHES TO THE FABRICATION OF SURFACE TEST STRUCTURES ON SILICON. SURFACE FEATURES ON THE FIRST STRUCTURE WILL BE PRODUCED BY CONTROLLABLY ETCHING THERMALLYGROWN OXIDES. FEATURES ON THE SECOND WILL BE MADE BY ETCHING PIEZOELECTRIC THIN FILMS. USING THE PIEZOELECTRIC FILM AS PART OF A CAPACITOR, STEP-HEIGHT CAN BE VARIED AND PRO ...

    SBIR Phase I 1992 Department of Commerce
  2. DEVELOPMENT OF RULES FOR FOLDING OF BIOTECHNOLOGY PRODUCED PROTEIN

    SBC: BIOELASTICS RESEARCH, LTD.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  3. ACTIVE NOISE AND VIBRATION CONTROL FOR AUXILIARY PCWER UNITS

    SBC: Centrair Corp            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  4. DIGESTIVE ENZYME SUPPLEMENTS TO INERT FEEDS FOR SMALL-EGG FISH LARVAE

    SBC: International Aquaculture Res            Topic: N/A

    INADEQUATE STARTER FEEDS SEVERELY HOLD BACK NEW AQUACULTURE ENTERPRISES SUCH AS PRESENT ATTEMPTS TO RAISE FISHES WHOSE LARVAE DEVELOP FROM SMALL EGGS AND HAVE VERY "DIFFICULT" FOOD REQUIREMENTS. INERT LARVAL FEEDS HAVE NOT SUCCESSFULLYELIMINATED THE STRICT DEPENDENCY ON NATURAL FORAGE DURING THE CRITICAL POST-LARVAL STAGE AFTER YOLK ABSORPTION AND BEFORE THE DEVELOPMENT OF A DIGESTIVE SYSTEM WITH ...

    SBIR Phase I 1987 Department of Commerce
  5. TECHNICAL FEASIBILITY DEVELOPING A RECEPTOR TEST FOR A MODEL BIOLOGICAL TOXIN

    SBC: Environmental Diagnostics            Topic: N/A

    ENVIRONMENTAL DIAGNOSTICS, INC. PROPOSED TO DETERMINE THE FEASIBILITY OF APPLYING ITS NEW INNOVATIVE HAPTEN TECHNOLOGY TO THE DEVELOPMENT OF IMMUNORECEPTORS FOR DETECTION AND ASSAY OF BIOLOGICAL TOXINS. THE NEW HAPTEN RECEPTOR TECHNOLOGY OVERCOMES PREVIOUS SCIENTIFIC LIMITATIONS AND TECHNICAL DIFFICULTIES IN DEVELOPING IMMUNOASSAYS FOR HIGHLYTOXIC, LOW MOLECULAR WEIGHT PROTEIN TOXINS. TO DATE, THE ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. DEMONSTRATION OF HIGH LIFT TO DRAG RATIO ROGALLO WING

    SBC: Flight Dynamics Inc            Topic: N/A

    THE PROJECT WILL BE DEVOTED TO SELECTING AN OPTIMUM CONFIGURATION AND RUNNING 1/4 SCALE MODEL TESTS OF A ROGALLO TYPE WING. THE WING WILL HAVE HIGHER THAN USUAL ASPECT RATIOS FOR ROGALLO WINGS, AND WILL BE AIR DEPLOYABLE. A CONTROL SYSTEM TO AUTOMATICALLY LAND THE VEHICLE WILL BE DEVELOPED. FINAL DESIGN OF A FULL SCALE VEHICLE WILL BE DELIVERED.

    SBIR Phase I 1987 Department of DefenseArmy
  7. TACTICAL DECEPTION INFRARED SIGNATURE GENERATOR ALTERNATIVES

    SBC: Nichols Research Corp            Topic: N/A

    A TWO DIMENSIONAL PANEL WHOSE THERMAL IMAGE (WHEN HEATED BY AN EXTERNAL POWER SOURCE) IS SIMILAR TO AN OPERATING VEHICLE WHEN VIEWED AT DIFFERENT ASPECT AND ELEVATION ANGLES IS PROPOSED. THE PANEL WOULD ACT AS A DECOY FOR THE COMBAT VEHICLE AND SHOULD PROVIDE A CREDIBLE IMAGE TO AN IR SENSOR. IN ADDITION, THE PANEL WILL BE LIGHTWEIGHT, COMPACT AND EASILY DEPLOYABLE.

    SBIR Phase I 1987 Department of DefenseArmy
  8. CERAMIC COMPONENT NON-DESTRUCTIVE TESTING TECHNOLOGY

    SBC: Nichols Research Corp            Topic: N/A

    OPTICAL SIGNATURE ANALYSIS WILL BE APPLIED TO MASS-PRODUCTION QUALITY CONTROL OF ENGINEERING CERAMICS. ADAPTATION OF PROVEN EFFECTIVE OPTICAL TECHNIQUES TO MASS PRODUCTION REQUIRES INNOVATION IN RAPID DATA ACQUISITION AND PROCESSING. THE PROPOSED INNOVATION APPLIES STRATEGIC DEFENSE INITIATIVE (SDI) DISCRIMINATION TECHNIQUES. LIFETIME OF CERAMIC WEAR PARTS, SUCH AS BEARING AND CAMS, CAN DEPEND ON ...

    SBIR Phase I 1987 Department of DefenseArmy
  9. CARBON SURFACE MODIFICATIONS TO ACHIEVE HYDROPHOBICITY

    SBC: Perfect View Inc.            Topic: N/A

    PERFECT VIEW INC. AND THE PRINCIPAL INVESTIGATOR, DR. A. J. ATTAR, HAVE RECENTLY OBTAINED A PATENT ON A METHOD TO REMOVE MINERAL WATER FROM COAL BY FIRST TURNING ITS SURFACE HYDROPHOBIC (U.S. PATENT 4,597,769, ISSUED JULY 1ST, 1986). THE TREATMENT INVOLVES A VERY LOW-COST CHEMICAL REACTION WHICH CONVERTS THE HYDROXLIC AND CARBOXYLIC SURFACE FUNCTIONALITIES TO ETHERS AND ESTERS. THIS TREATMENT REDU ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. PLUME MODELING AND TESTING

    SBC: Physicon Inc            Topic: N/A

    TACTICAL MANEUVERING INTERCEPTORS OPERATE IN THE ATMOSPHERE BUT MAY BE AT A HIGH ENOUGH ALTITUDE TO ENCOUNTER FREE MOLECULAR FLOW. PLUME MODELS USED TO SIMULATE VARIOUS CONDITIONS ENCOUNTERED DURING FLIGHT REQUIRE INCREASINGLY COMPLEX COMPUTATIONAL RESOURCES TO ADVANCE THE STATE-OF-THE-ART. AS THESE MODELS BECOME MORE AND MORE COMPLEX THE RESULTS PREDICTED BY THE MODEL ARE NOT EASILY RELATED TO TH ...

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government