You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NANOMETER-SIZE STEP HEIGHT TEST STRUCTURES
SBC: Advanced Technologies/Laboratories Intl Topic: N/AMCNC PROPOSES A FEASIBILITY STUDY AND EVALUATION OF THREE PROMISING APPROACHES TO THE FABRICATION OF SURFACE TEST STRUCTURES ON SILICON. SURFACE FEATURES ON THE FIRST STRUCTURE WILL BE PRODUCED BY CONTROLLABLY ETCHING THERMALLYGROWN OXIDES. FEATURES ON THE SECOND WILL BE MADE BY ETCHING PIEZOELECTRIC THIN FILMS. USING THE PIEZOELECTRIC FILM AS PART OF A CAPACITOR, STEP-HEIGHT CAN BE VARIED AND PRO ...
SBIR Phase I 1992 Department of Commerce -
Ultra Lethal Targeting by Optical Recognition ULTOR
SBC: Advanced Optical Systems, Inc Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseNavy -
DEVELOPMENT OF RULES FOR FOLDING OF BIOTECHNOLOGY PRODUCED PROTEIN
SBC: BIOELASTICS RESEARCH, LTD. Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseArmy -
ACTIVE NOISE AND VIBRATION CONTROL FOR AUXILIARY PCWER UNITS
SBC: Centrair Corp Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseArmy -
Development of 6H-SIC CMOS Transistors for Insertion into a 3500C Operational Amplifier
SBC: CREE RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseNavy -
SHIP DESIGN LIFE CYCLE COSTING ASSISTANT
SBC: NEOTERIC TECHNOLOGIES, INC. Topic: N/AThis project establishes the baseline for developing a usable ship design Life Cycle Cost (LCC) estimating assistant that adequately accounts for Producibility and Operation and Support (O&S) costs. Existing Cost Estimating (CE) methodologies are unsatisfactory, primarily due to their dependency upon data that is impossible or impractical to get, especially during the acquisition phase and particu ...
SBIR Phase I 1992 Department of DefenseNavy -
A HIGH POWER THERMAL BATTERY
SBC: Technochem Company Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseNavy -
Enhanced Thermal Energy Storage in Clothing with
SBC: Triangle Research and Development Corporation Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseNavy -
TECHNICAL FEASIBILITY DEVELOPING A RECEPTOR TEST FOR A MODEL BIOLOGICAL TOXIN
SBC: Environmental Diagnostics Topic: N/AENVIRONMENTAL DIAGNOSTICS, INC. PROPOSED TO DETERMINE THE FEASIBILITY OF APPLYING ITS NEW INNOVATIVE HAPTEN TECHNOLOGY TO THE DEVELOPMENT OF IMMUNORECEPTORS FOR DETECTION AND ASSAY OF BIOLOGICAL TOXINS. THE NEW HAPTEN RECEPTOR TECHNOLOGY OVERCOMES PREVIOUS SCIENTIFIC LIMITATIONS AND TECHNICAL DIFFICULTIES IN DEVELOPING IMMUNOASSAYS FOR HIGHLYTOXIC, LOW MOLECULAR WEIGHT PROTEIN TOXINS. TO DATE, THE ...
SBIR Phase I 1987 Department of DefenseArmy -
DEMONSTRATION OF HIGH LIFT TO DRAG RATIO ROGALLO WING
SBC: Flight Dynamics Inc Topic: N/ATHE PROJECT WILL BE DEVOTED TO SELECTING AN OPTIMUM CONFIGURATION AND RUNNING 1/4 SCALE MODEL TESTS OF A ROGALLO TYPE WING. THE WING WILL HAVE HIGHER THAN USUAL ASPECT RATIOS FOR ROGALLO WINGS, AND WILL BE AIR DEPLOYABLE. A CONTROL SYSTEM TO AUTOMATICALLY LAND THE VEHICLE WILL BE DEVELOPED. FINAL DESIGN OF A FULL SCALE VEHICLE WILL BE DELIVERED.
SBIR Phase I 1987 Department of DefenseArmy