You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Software for Weld Sensing and Control

    SBC: ANAMED, INC.            Topic: N/A

    Gas Metal Arc Welding (GMAW) accounts for a significant proportion of all welding performed. Due to its relatively high speeds and metal deposition rates as well as relatively low equipment and maintenance costs, it is also the most popular process for automated, and especially robotic, welding. There are, however, problems that significantly restrict its manufacturing applications. The efforts at ...

    SBIR Phase I 1997 Department of Commerce
  2. Study of Operation Conditions Including a Refrigerant Composition Heat

    SBC: Spauschus Associates, Inc.            Topic: N/A

    Zeotrope refrigerant mixtures have been proposed and used for energy saving. Matching the temperature glide of the refrigerant to the temperature change of the heat sink and source, while simultaneously reducing the pressure difference seen by the compressor will result in significantly improved efficiency. A new cycle based on a mixture cascade combined with a rectifier column has recently been i ...

    SBIR Phase I 1997 Department of Commerce
  3. NANOMETER-SIZE STEP HEIGHT TEST STRUCTURES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    MCNC PROPOSES A FEASIBILITY STUDY AND EVALUATION OF THREE PROMISING APPROACHES TO THE FABRICATION OF SURFACE TEST STRUCTURES ON SILICON. SURFACE FEATURES ON THE FIRST STRUCTURE WILL BE PRODUCED BY CONTROLLABLY ETCHING THERMALLYGROWN OXIDES. FEATURES ON THE SECOND WILL BE MADE BY ETCHING PIEZOELECTRIC THIN FILMS. USING THE PIEZOELECTRIC FILM AS PART OF A CAPACITOR, STEP-HEIGHT CAN BE VARIED AND PRO ...

    SBIR Phase I 1992 Department of Commerce
  4. DIGESTIVE ENZYME SUPPLEMENTS TO INERT FEEDS FOR SMALL-EGG FISH LARVAE

    SBC: International Aquaculture Res            Topic: N/A

    INADEQUATE STARTER FEEDS SEVERELY HOLD BACK NEW AQUACULTURE ENTERPRISES SUCH AS PRESENT ATTEMPTS TO RAISE FISHES WHOSE LARVAE DEVELOP FROM SMALL EGGS AND HAVE VERY "DIFFICULT" FOOD REQUIREMENTS. INERT LARVAL FEEDS HAVE NOT SUCCESSFULLYELIMINATED THE STRICT DEPENDENCY ON NATURAL FORAGE DURING THE CRITICAL POST-LARVAL STAGE AFTER YOLK ABSORPTION AND BEFORE THE DEVELOPMENT OF A DIGESTIVE SYSTEM WITH ...

    SBIR Phase I 1987 Department of Commerce
US Flag An Official Website of the United States Government