You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NANOMETER-SIZE STEP HEIGHT TEST STRUCTURES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    MCNC PROPOSES A FEASIBILITY STUDY AND EVALUATION OF THREE PROMISING APPROACHES TO THE FABRICATION OF SURFACE TEST STRUCTURES ON SILICON. SURFACE FEATURES ON THE FIRST STRUCTURE WILL BE PRODUCED BY CONTROLLABLY ETCHING THERMALLYGROWN OXIDES. FEATURES ON THE SECOND WILL BE MADE BY ETCHING PIEZOELECTRIC THIN FILMS. USING THE PIEZOELECTRIC FILM AS PART OF A CAPACITOR, STEP-HEIGHT CAN BE VARIED AND PRO ...

    SBIR Phase I 1992 Department of Commerce
  2. LASER RADAR SCENE PROJECTOR, PHASE I PROPOSAL

    SBC: Aegis Technologies Group, LLC, The            Topic: N/A

    THIS PROPOSAL ADDRESSES THE DEVELOPMENT OF A SET OF TECHNICAL SPECIFICATIONS FOR THE ESTABLISHMENT OF A LASER RADAR SEEKER HARDWARE-IN-THE-LOOP (HWIL) TESTING AND EVALUATION FACILITY. AEGIS RESEARCH WILL DETERMINE THE CAPABILITIES OF SEEKER UNITS ANTICIPATED TO BE TESTED BY SUCH A FACILITY, DETERMINE A SET OF REQUIREMENTS BASED ON THESE CAPABILITIES, INVESTIGATE THE CURRENT STATE-OF-THE-ART IN SIM ...

    SBIR Phase I 1992 Department of DefenseAir Force
  3. INNOVATIVE FUEL INJECTOR/FLAMEHOLDER CONCEPT FOR RAMBURNERS

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    RECENT STUDIES OF TURBORAMJET PROPULSION SYSTEMS HAVE IDENTIFIED THE NEED OF ADVANCED, INSTREAM FUEL INJECTION/FLAMEHOLDER SCHEMES FOR RAMBURNERS. THIS PROJECT PROPOSES TO DEVELOP A NEW, CLOSE-COUPLED FUEL INJECTOR/FLAMEHOLDER CONCEPT WHOSE DISTINGUISHING CHARACTERISTIC IS A CORRUGATED FLAMEHOLDER SURFACE. AS COMPARED TO A CONVENTIONAL INTEGRAL FUEL INJECTOR/FLAMEHOLDER (IFF) CONCEPT, THE NEW CONC ...

    SBIR Phase II 1992 Department of DefenseAir Force
  4. PRESSURE-BASED HIGH ORDER TVD METHODOLOGY FOR DYNAMIC STALL CONTROL

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    THE QUANTITIVE PREDICTION OF THE DYNAMICS OF SEPARATING UNSTEADY FLOWS, SUCH AS DYNAMIC STALL, IS OF CRUCIAL IMPORTANCE. THIS STUDY PROPOSES SEVERAL NEW METHODOLOGIES OF SOLVING 3-D NAVIER-STOKES EQUATIONS WITH PRESSURE-BASED ALGORITHM IN BOTH STATIONARY AND MOVING (BODY-FIXED) COORDINATES. THE PROPOSED PRESSURE-BASED ALGORITHM IS EQUALLY EFFICIENT FOR LOW SPEED INCOMPRESSIBLE AND HIGH SPEED COMPR ...

    SBIR Phase II 1992 Department of DefenseAir Force
  5. INFLUENCE OF SUPERCRITICAL CONDITIONS ON PRECOMBUSTION CHEMISTRY AND TRANSPORT BEHAVIOR OF JET FUELS

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  6. COMPUTER MODELING OF LASER DAMAGE TO THE EYE

    SBC: CONCEPTUAL MINDWORKS, INC.            Topic: N/A

    MODERN WARFARE PRESENTS A RISK OF LASER EYE DAMAGE, EITHER ACCIDENTAL OR FROM DELIBERATE ENEMY ACTION. WE PROPOSE TO DEVELOP COMPUTER MODELS WHICH WILL ALLOW US TO SIMULATE SHORT PULSE LASER GENERATED VISION LOSS. THESE MODELS WILL BE CHECKED AGAINST EXPERIMENTAL DATA AND ADJUSTED AS NECESSARY. AS THEY ARE PERFECTED, THEY WILL INCREASE THE USEFUL AMOUNT OF DATA FROM ANIMAL STUDIES BY EXTRAPOLATION ...

    SBIR Phase I 1992 Department of DefenseAir Force
  7. Evaluation of High Power 6H-SiC Microwave Field-Effect Transistors for High Temperature Operation

    SBC: CREE RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  8. HELMET-MOUNTED VISUAL SYS COMPONENTS AND ASSEMBLIES- MINIATURE CATHODE RAY RUBES (CRT'S)

    SBC: FED CORP.            Topic: N/A

    THIS SBIR PHASE I PROPOSAL SPECIFICALLY ADDRESSED 'EARLY STAGE' DEVELOPMENT ISSUES INVOLVED IN APPLYING FIELD EMISSION (FEA) TECHNOLOGY TO BUILD A MONOCHROME, FLAT SCREEN, PAGE SIZE, HIGH CONTRAST, HIGH RESOLUTION DISPLAY. A 90 MM DIAGONAL 700 X 7000 LINE BLACK AND WHITE HE LMET DISPLAY IS THE TARGETED PHASE II PRODUCT. COLOR DISPLAYS AND 138 MM DIAGONAL DISPLAYS ARE TARGETED TO FOLLOW THE INITIAL ...

    SBIR Phase II 1992 Department of DefenseAir Force
  9. HELMET-MOUNTED VISUAL SYS COMPONENTS AND ASSEMBLIES- MINIATURE CATHODE RAY RUBES (CRT'S)

    SBC: FED CORP.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  10. SMART AUTONOMOUS GUIDANCE TECHNOLOGY STUDY

    SBC: Intelligent Machine            Topic: N/A

    THERE IS A GROWING NEED FOR SMART AUTONOMOUS AIR DELIVERY OF CONVENTIONAL MUNITIONS. PRECISION ALL-WEATHER AUTONOMOUS GUIDANCE IS A FUNDAMENTAL BUILDING BLOCK FOR SUCH SYSTEMS. THE PROPOSED CONCEPT SYNTHESIS STUDY WILL INVESTIGATE AN INTEGRATED VISUAL-INERTIAL GUIDANCE CONCEPT THAT COMBINES IMAGING SENSORS AND INERTIAL COMPONENTS WITH IMAGE FLOW ALGORITHMS, INFORMATION ANALYSIS ALGORITHMS AND SITU ...

    SBIR Phase II 1992 Department of DefenseAir Force
US Flag An Official Website of the United States Government