You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NANOMETER-SIZE STEP HEIGHT TEST STRUCTURES

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    MCNC PROPOSES A FEASIBILITY STUDY AND EVALUATION OF THREE PROMISING APPROACHES TO THE FABRICATION OF SURFACE TEST STRUCTURES ON SILICON. SURFACE FEATURES ON THE FIRST STRUCTURE WILL BE PRODUCED BY CONTROLLABLY ETCHING THERMALLYGROWN OXIDES. FEATURES ON THE SECOND WILL BE MADE BY ETCHING PIEZOELECTRIC THIN FILMS. USING THE PIEZOELECTRIC FILM AS PART OF A CAPACITOR, STEP-HEIGHT CAN BE VARIED AND PRO ...

    SBIR Phase I 1992 Department of Commerce
  2. INTERACTIVE DNA SEQUENCE PROCESSING FOR A MICROCOMPUTER

    SBC: Advanced Technologies/Laboratories Intl            Topic: N/A

    DNA AND BIOSEQUENCES ARE BEING DETERMINED FASTER THAN THEY CAN BE COMPARED AND ANALYZED. PRESENT TECHNIQUES FOR RIGOROUSLY SEARCHING A LARGE DATABASE ARE COSTLY AND TIME CONSUMING. UNDER ALL PLAUSIBLE GROWTH PROJECTIONS, THE PROBLEM WILL SOON BECOME OVERWHELMING. A CUSTOM, VERY LARGE SCALE INTEGRATED CIRCUIT THAT COULD BE USED FOR HIGH SPEED COMPARISON, ANALYSIS, AND INTERPRETATION OF DNA AND PROT ...

    SBIR Phase I 1992 Department of Energy
  3. COMPUTER-AIDED-ENGINEERING (CAE) FOR THE GAS-ASSISTED INJECTION MOLDING PROCESS

    SBC: Advanced Cae Technology Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Science Foundation
  4. FUNCTIONAL INTEGRAL FORMULATION OF THREAT AVOIDANCE MISSION PLANNING

    SBC: A & D Assoc.            Topic: N/A

    MODERN COMPUTATION TECHNIQUES SUCH AS PARALLEL PROCESSING ARE WELL-SUITED FOR THE SOLUTION OF SUCH PROBLEMS AS THE SIMULTANEOUS GLOBAL EXTREMIZATION OF MULTIPLE VARIABLES IN A COMPLEX, NONLINEAR, PROBABILISTIC STATE SPACE. HOWEVER, THE USE OF THESE TECHNIQUES TO SOLVE A GIVEN PROBLEM REQUIRES THAT IT FIRST BE FORMULATED IN THESE TERMS. CURRENTLY, THREAT-AVOIDANCE MISSION PLANNING IS APPROACHED AS ...

    SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency
  5. Phase separated enzyme inhibitor electrode for mercury compounds

    SBC: ALDERON BIOSCIENCES, INC.            Topic: N/A

    MERCURY IS A HIGHLY TOXIC MATERIAL THAT OCCURS IN BOTH ORGANIC AND INORGANIC FORMS. BECAUSE OF ITS WIDESPREAD INDUSTRIAL USE THE WHOLE POPULATION IS EXPOSED TO MERCURY COMPOUNDS EVERYDAY. THERE IS A NEED FOR A FAST, EASY TO USE, INEXPENSIVE, SENSITIVE METHOD FOR THE DETECTION OF MERCURY TO REDUCE THE RISK OF CHRONIC EXPOSURE. OUR OBJECTIVE IS TO DEVELOP A NEW TECHNIQUE FOR THE SELECTIVE DETECTION ...

    SBIR Phase II 1992 Department of DefenseArmy
  6. ADVANCED AI TECHNIQUES FOR MULTIACUITY ATR

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    A FUNDAMENTAL PROBLEM IN AUTOMATIC TARGET RECOGNITION (ATR) IS THE OVERWHELMING AMOUNT OF SENSOR DATA WHICH MUST BE PROCESSED. MANY ADVANCED ATR ALGORITHMS WHICH REDUCE THE FALSE ALARM RATE CANNOT BE EXECUTED IN REAL TIME DUE TO COMPUTATIONAL COMPLEXITY. THIS LIMITS OVERALL SYSTEM PERFORMANCE. IN ATR, THE FEATURES THAT MUST BE RESOLVED ARE LOCALIZED WITHIN THE FIELD-OF-VIEW (FOV) OF THE SENSOR. UN ...

    SBIR Phase II 1992 Department of DefenseAir Force
  7. DIGITAL INTERFACE BETWEEN MULTISPECTRAL FORCE LAYDOWN AND MULTISPECTRAL ENVIRONMENT GENERATOR

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    A METHOD OF CONVENIENTLY ADOPTING EXISTING SCENARIO LAYDOWNS TO A FORM COMPATIBLE WITH EXISTING MULTISPECTRAL SIMULATOR WILL ALLOW FACILITIES SUCH AS THE CECOM CENTER FOR EW/RSTA TO QUICKLY AND ECONOMICALLY CONFIGURE TEST SCENARIOS. NUMEROUS "BLESSED" MULTISPECTRAL LAYDOWNS EXIST THAT COULD BE IMPLEMENTED INTO SIMULATOR TESTING METHODOLOGIES WITH A MULTISPECTRAL INTERFACE. A COMPLEMENTARY METHOD F ...

    SBIR Phase II 1992 Department of DefenseArmy
  8. ATTENTION IN ACTIVE VISION

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    AN ATTENTION MECHANISM CAN INFLUENCE SYSTEM BEHAVIOR AND PERFORMANCE ONLY TO THE EXTENT IN WHICH SYSTEM RESOURCES ARE ALLOCATABLE. A KEY VISUAL SYSTEM RESOURCE IS ACUITY, AND YET THIS RESOURCE IS FIXED IN CONVENTIONAL UNIFORM ACUITY MACHINE VISION. FEATURES TO BE RESOLVED BY ACTIVE VISION ARE TYPICALLY LOCALIZED WITHIN THE FOV. UNIFORM SAMPLING WITHIN THE FOV IS THUS INAPPROPRIATE; REGIONS WITH LI ...

    SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency
  9. SIMULATOR NETWORKING

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseArmy
  10. PROGRAMMABLE EMITTER SIGNATURE GENERATION

    SBC: AMHERST SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
US Flag An Official Website of the United States Government