You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Information Fusion System for Counter-Terrorism Operations

    SBC: DEUMBRA, INC.            Topic: OSD03027

    21 st Century Technologies Inc proposes the Integrated Fusion Dashboard, a level 2-3 knowledge-based asymmetric pattern recognition, detection, and fusion framework supporting persistent and adaptive surveillance collection strategies. We shall exploit specialized detectors, learning and reasoning algorithms, and social network analysis that access integrated Multi-INT data and synergistically ...

    SBIR Phase II 2005 Department of DefenseNavy
  2. APEX: Adaptive and Peripheral surveillance fusion Engine

    SBC: DEUMBRA, INC.            Topic: N05T019

    It is computationally infeasible to implement a complete Level 2/3-fusion solution that has detailed knowledge of all parts of an area of interest all the time. A staged approach is needed where the first stage implements a real time peripheral vision sensor analysis to identify asymmetric threats. The second stage implements a "foveal vision" sensor analysis that identifies, links and validates a ...

    STTR Phase I 2005 Department of DefenseNavy
  3. Exploratory Development of Functionally Graded Nano-Composite (FGNC) for Gear Applications

    SBC: ADVANCED POWDER SOLUTIONS INC            Topic: N05T006

    Recent attempts at improvements in V-22 gear life have focused on coatings over existing gear materials (for ex. DLC on Pyrowear 0053, or others), unfortunately for various reasons (interface failure, high contact stress, thermal expansion mismatch, etc.) these materials have never made an impact on the V-22 program or made it into Textron-Bell Helicopter's materials insertion programs. Currently ...

    STTR Phase I 2005 Department of DefenseNavy
  4. Analysis Tools for Detection and Diagnosis of Biological Threats

    SBC: ALPHA-GAMMA TECHNOLOGIES, INC.            Topic: CBD04113

    DNA microarray technology, in combination with statistical and predictive modeling tools, could be used to evaluate thousands of genes against distinct gene expression patterns induced by chemical/biological agents to provide early identification and speed therapeutic intervention. The overall objective of this Phase II effort is to leverage existing public domain resources and commercial tools t ...

    SBIR Phase II 2005 Department of DefenseOffice for Chemical and Biological Defense
  5. ASIC Forensic Redesign

    SBC: CROSSFIELD TECHNOLOGY LLC            Topic: N05031

    Crossfield proposes an innovative forensic approach for re-engineering legacy devices based upon using a mechanical/ion-etch (dry etch) process to extract transistor and transistor interconnect data. This transistor netlist data is then fed through an extract program to establish a gate level netlist from the transistor and transistor interconnect database. The gate level netlist, together with ...

    SBIR Phase I 2005 Department of DefenseNavy
  6. Bio-Remediation of Hydrocarbons on Inactive Ships

    SBC: EnSolve            Topic: N04098

    Vessels of all types have a limited useful life and must ultimately be dismantled or scuttled as artificial reefs, with wastes properly disposed. The Navy is seeking a means of removing hydrocarbons from inactive ships prior to ship dismantling or sinking as an artificial reef. The Phase I project investigated the use of a biological/mechanical system that was capable of removing free-phase oil w ...

    SBIR Phase II 2005 Department of DefenseNavy
  7. Focal Plane array processors with adaptive visual range and millimeter wave sensors

    SBC: EUTECUS, INC.            Topic: N04T028

    This STTR Phase II proposal is based on work completed under the STTR Phase I grant entitled "Focal Plane array processors with adaptive visual range and millimeter wave sensors" (Contract No. N00014-04-M-0212). In this Phase II project, we propose the development of two lines of ultra-high speed focal plane sensor and processor arrays equipped with (i) adaptive image sensors sensitive in the visu ...

    STTR Phase II 2005 Department of DefenseNavy
  8. Aircraft High-Power Semiconductor Line Contactors

    SBC: Ronald C Cooper            Topic: N05015

    Proposal to access modification of current static transfer switch (STS) product technology for military aircraft operation. High-speed STS in the 120/208 voltage range have been available for government use for several years. However these 60Hz switches will require significant control and packaging modifications for military aircraft installation. Higher Power Engineering (HPE) has significant ...

    SBIR Phase I 2005 Department of DefenseNavy
  9. Multi-Sensor Terrain Fusion

    SBC: INTERNATIONAL ASSOCIATION OF VIRTUAL ORGANIZATIONS, INCORPORATED            Topic: N03174

    The Navy is seeking improved capabilities to generate automatically elevation data products and have updatable and retrievable output via an automated advanced tactical terrain database system, supporting the Tomahawk Cruise Missile Program. The envisioned end-to-end solution must be able to process, manage, and/or fuse a variety of inputs, and these include multi-source imagery as well as existin ...

    SBIR Phase II 2005 Department of DefenseNavy
  10. Automatic Three-Dimensional (3-D) Target Template Generation

    SBC: INTERNATIONAL ASSOCIATION OF VIRTUAL ORGANIZATIONS, INCORPORATED            Topic: N05017

    The US Navy seeks improved capabilities to generate automatically 3-D target template data in support of the Tomahawk Cruise Missile Program. Our collective approach herein is divided between: (1) feature generation using enhancements to the IAVO TrueDEM DEM extraction tool and (2) a new high-level system called TrueTemplate that automatically builds 3-D target templates from the TrueDEM feature ...

    SBIR Phase I 2005 Department of DefenseNavy
US Flag An Official Website of the United States Government