You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Analysis Tools for Detection and Diagnosis of Biological Threats

    SBC: ALPHA-GAMMA TECHNOLOGIES, INC.            Topic: CBD04113

    DNA microarray technology, in combination with statistical and predictive modeling tools, could be used to evaluate thousands of genes against distinct gene expression patterns induced by chemical/biological agents to provide early identification and speed therapeutic intervention. The overall objective of this Phase II effort is to leverage existing public domain resources and commercial tools t ...

    SBIR Phase II 2005 Department of DefenseOffice for Chemical and Biological Defense
  2. Handheld Photoacoustic Chemical Agent and Toxic Industrial Material Detector

    SBC: MANNING APPLIED TECHNOLOGY            Topic: CBD05112

    Manning Applied Technology proposes to develop a handheld infrared spectrometer, ideally suited to detection of airborne chemical agents at and below permissible exposure limits. This approach offers unmatched sensitivity and specificity for detection of all types of chemical vapors. The instrument is modular, rugged, compact and highly sensitive. Volume pricing will be less than $1000 each. ...

    SBIR Phase I 2005 Department of DefenseOffice for Chemical and Biological Defense
  3. Invitational Priority 4: Developing an Authoring Tool that Promotes Accessibility

    SBC: MSF&W            Topic: N/A

    Promotion of access to information in educational, employment, and community settings to develop an "accessibility first" authoring tool to support actively technical authors in the creation of accessible electronic documents

    SBIR Phase I 2005 Department of Education
  4. Imidazenil: A Protective Agent Against Chemical Warfare Agents induced Status Epilepticus

    SBC: NEUPHARMA, INC.            Topic: CBD05116

    The overall objective of this proposal is to demonstrated that imidazenil is a more potent and safer protective agent than diazepam against chemical warfare nerve agent (CWNA)-induced seizure/status epilepticus, neuropathology, and neurobehavioral deficits. Thus we will compare the dose-dependent efficacy of imidazenil or diazepam administered alone and in combination with levetiracetam in protect ...

    SBIR Phase I 2005 Department of DefenseOffice for Chemical and Biological Defense
  5. Hermetic Textile Closure Hardware System

    SBC: SIGMA K CORP            Topic: CBD04110

    Effective collective protection fabrics must have a reliable closure system. During our Phase I Work Plan, Sigma-K began developing a Hermetic Textile Closure Hardware (HATCH) system. The HATCH combines both a magnetic and geometric self locking mechanism that will provide a hermetic seal when closed. Our current Phase I successes include developing self closing samples that can provide a hermetic ...

    SBIR Phase II 2005 Department of DefenseOffice for Chemical and Biological Defense
  6. Mainstreaming Web Accessibility: Making it Cost-Effective, User-Friendly, and Attractive to Non-Technical Audiences

    SBC: Universal by Design            Topic: N/A

    Conceputal prototype testing to improve web accessibility and make it cost-effective and attractive to non-technical audiences

    SBIR Phase I 2005 Department of Education
  7. A USER-FRIENDLY VOICE INTERACTIVE LEARNING AID FOR INDIVIDUALS WITH HANDICAPS (VILAH)

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Education
  8. CURB CLIMBING WHEELCHAIR DEVELOPMENT

    SBC: Triodyne Inc            Topic: N/A

    SIDEWALK RAMPS, ADOPTED FOR THE SAFETY AND CONVENIENCE OF WHEELCHAIR BOUND CITIZENS, HAVE EXHIBITED A NUMBER OF SHORTCOMINGS. MILLIONS OF DOLLARS HAVE BEEN SPENT, AND WILLCONTINUE TO BE SPENT, FOR THE CONVERSION OF CURBS INTO RAMPSA LESS THAN SATISFACTORY SOLUTION TO THE PROBLEM. A MORE FEASIBLE APPROACH TO ALTERING THE MILLIONS OF CURBS IS THE ADDITION OF CURB CLIMBING CAPABILITIES TO THE FIFTY T ...

    SBIR Phase I 1987 Department of Education
US Flag An Official Website of the United States Government