You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A SYSTEM IDENTIFICATION TECHNICAL IS PROPOSED FOR NON-DESTRUCTIVE TEST TO DETECT UNBOUNDS IN LARGE BONDED COMPONENTS.

    SBC: Advanced Technology & Research            Topic: N/A

    A SYSTEM IDENTIFICATION TECHNICAL IS PROPOSED FOR NON-DESTRUCTIVE TEST TO DETECT UNBOUNDS IN LARGE BONDED COMPONENTS. THE TECHNIQUE USES THE SYSTEM'S TIME RESPONSE DATA DUE TO RANDOM INPUT EXCITATION. SYSTEM'S EIGENVALUES AND EIGENVECTORS ARE RETRIEVED FROM THE TIME RESPONSES AND USED FOR THE CONSTRUCTION OF ACCURATE SYSTEM MATHEMATICAL MODELS. SYSTEM'S CHANGE DUE TO CRACKS, VOIDS, UNBONDS BETWEEN ...

    SBIR Phase I 1984 Department of DefenseNavy
  2. METHODS ARE DESPERATELY NEEDED TO DISCERN THE STRUCTURAL INTEGRITY OF CRITICAL COMPONENTS OF WEAPON SYSTEMS SUCH AS PRESSURE VESSEL CASES.

    SBC: Advanced Technology & Research            Topic: N/A

    METHODS ARE DESPERATELY NEEDED TO DISCERN THE STRUCTURAL INTEGRITY OF CRITICAL COMPONENTS OF WEAPON SYSTEMS SUCH AS PRESSURE VESSEL CASES. AT THIS TIME, NO TECHNIQUE EXISTS WHICH PERMITS A GLOBAL MONITORING OF THE OPERATIONAL READINESS OF ANY STRUCTURES, INCLUDING COMPOSITE MOTOR CASES. THE RANDOMDEC PROCEDURE, WHICH IS PLANNED TO BE UTILIZED UNDER THIS PROPOSED STUDY, APPEARS TO HAVE THE CAPABILI ...

    SBIR Phase I 1984 Department of DefenseNavy
  3. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  4. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  5. CRYSTAL GROWTH AND CHARACTERIZATION OF A VARIABLE BANDGAP SEMIMAGNETIC SEMICONDUCTOR: HG1-XMNXTE

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  6. DEVELOPMENT OF REAL-TIME X-RAY DIFFRACTION INSTRUMENTATION TO ASSESSAUTOMATED MANUFACTURE OF RDX AND HMX

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  7. INVESTIGATION OF FUNCTIONAL PROGRAMMING IN DEFENSE APPLICATIONS

    SBC: Computer Technology Associates            Topic: N/A

    THE DOD SOFTWARE INITIATIVE CLEARLY IDENTIFIED THE CHALLENGES FOR FUTURE SYSTEMS. THEY WILL HAVE TO BE LARGER AND MORE COMPLEX, DEVELOPED AND DELIVERED MORE RAPIDLY, AND MAINTAINED OVER LONGER PERIODS. TRADITIONAL PROGRAMMING TECHNIQUES, HOWEVER, APPEAR TO HAVE REACHED THEIR LIMITS, MAKING MUCH LARGER SOFTWARE SYSTEMS VIRTUALLY IMPOSSIBLE TO BUILD AND MAINTAIN. AN ALTERNATIVE APPROACH, CALLED FUNC ...

    SBIR Phase II 1984 Department of DefenseNavy
  8. INVESTIGATE THE REQUIREMENTS FOR A SEMICONDUCTOR BASED TIMED FAULT MODULE: PHYSICAL DIMENSIONS, ELECTRICAL SPECIFICATIONS, ERGONOMIC REQUIREMENTS, POSSIBLE CONFIGURATIONS, AND LEVEL OF USER EXPERTISE NECESSARY TO SUCCESSFULLY UTILIZE THE ADAPTER.

    SBC: Electronic Sys Devlpmnt/trng            Topic: N/A

    INVESTIGATE THE REQUIREMENTS FOR A SEMICONDUCTOR BASED TIMED FAULT MODULE: PHYSICAL DIMENSIONS, ELECTRICAL SPECIFICATIONS, ERGONOMIC REQUIREMENTS, POSSIBLE CONFIGURATIONS, AND LEVEL OF USER EXPERTISE NECESSARY TO SUCCESSFULLY UTILIZE THE ADAPTER. DESIGN, PROTOTYPE, AND EVALUATE A DISCRETE COMPONENT VERSION WITH DATA TO DETERMINE CUSTOM LARGE SCALE INTEGRATION/PROGRAMMABLE LOGIC ARRAY MANUFACTURE P ...

    SBIR Phase I 1984 Department of DefenseNavy
  9. HIGH SENSITIVITY, ONE-SIDED X-RAY INSPECTION SYSTEM

    SBC: Industrial Quality, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
  10. HIGH LEVEL SIMULATION OF ELECTRONIC SYSTEMS

    SBC: Information Research            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseNavy
US Flag An Official Website of the United States Government