You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. EXPERT ASSISTANT FOR PERFORMANCE ENGINEERING OF LARGE EMBEDDED REAL-TIME SOFTWARE

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseNavy
  2. RELIABLE WELDING OF HSLA STEELS BY SQUARE WAVE PULSING USING AN ADVANCED SENSING (EDAP) TECHNIQUE

    SBC: Applied Fusion Technologies            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseNavy
  3. AURAL PROCESSED SIGNALS FOR MINE DETECTION AND CLASSIFICATION

    SBC: Ard Corp.            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseNavy
  4. EXTREME SEAWAY LOADS CHARACTERIZATION FOR SHIP STRUCTURE

    SBC: BAND, LAVIS & ASSOC., INC.            Topic: N/A

    SHIPS HAVE LONG BEEN DESIGNED TO EMPIRICAL FORMULATE THAT DO NOT REPRESENT REALISTIC CONDITIONS FOR MODERN NAVAL VESSELS IN EXTREME SEA CONDITIONS. AS A CONSEQUENCE, SHIPS FREQUENTLY SUFFER EXPENSIVE DAMAGE IN HEAVY SEAS. THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO ATTEMPT TO IDENTIFY SPECIFIC EXAMPLES OF EXTREME WAVES OF THE TYPE THAT HAVE BEEN KNOWN TO CAUSE SPECIFIC TYPES OF DAMAGE. AS FAR AS ...

    SBIR Phase II 1985 Department of DefenseNavy
  5. DEVELOPMENT OF REAL-TIME X-RAY DIFFRACTION INSTRUMENTATION TO ASSESSAUTOMATED MANUFACTURE OF RDX AND HMX

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    RECENT WORK PERFORMED AT NSWC, WHITE OAK, MD HAS SHOWN THAT CONVENTIONAL LAUE X-RAY TRANSMISSION PATTERNS OBTAINED BY FILM METHODS GIVE AN INDICATION OF GROWN-IN MICROSTRUCTURAL DEFORMATION OF HOLSTEN CLASS D RDX ENERGETIC MATERIALS. THE OBJECT OF THIS STUDY IS TO DETERMINE IF X-RAY LAUE PATTERNS FROM RDX AND/OR HMX ILLUSTRATING SEVERE MICROSTRUCTURAL DEFORMATION ALSO CORRESPOND TO POOR PERFORMANC ...

    SBIR Phase II 1985 Department of DefenseNavy
  6. CRYSTAL GROWTH AND CHARACTERIZATION OF A VARIABLE BANDGAP SEMIMAGNETIC SEMICONDUCTOR: HG1-XMNXTE

    SBC: BRIMROSE CORPORATION OF AMERICA            Topic: N/A

    THE PROPOSED RESEARCH WORK IS A RESPONSE TO THE NATIONAL DEFENSE EFFORT OF THE UNITED STATES OF AMERICA TO ULTIMATELY MANUFACTURE A LOW COST, RELIABLE AND EFFECTIVE TURNABLE FREQUENCY FAR INFRARED (IR) DETECTOR THAT CAN BE PLACED UPON BOTH OUR OFFENSIVE AND DEFENSIVE WEAPONS SYSTEMS. THE MATERIAL THAT WILL BE INVESTIGATED IS THE "SEMIMAGNETIC" SEMICONDUCTOR HG 1-X MN X TE, A SISTER COMPOUND TO HG ...

    SBIR Phase II 1985 Department of DefenseNavy
  7. ANALYTICAL DECISION MAKING SOFTWARE- PHASE I

    SBC: Doty Associates Inc.            Topic: N/A

    AN AUTOMATED DECISION AID, USEABLE ON A MINICOMPUTER WILL BE DEVELOPED TO ANALYZE PROJECT COST, TAKING INTO ACCOUNT QUANTITIES, DELIVERY SCHEDULES, AND OTHER PROGRAMMATIC AND ECONOMIC VARIABLES. THE PROTOTYPE MODEL DEVELOPED IN PHASE I WILL INCLUDE A PROTOTYPE DATA BASE WHICH THE MODEL CAN MAIPULATE TO OBTAIN SUBSYSTEM COST INPUTS. THE MAJOR OBJECTIVES IN PHASE I ARE TO DEMONSTRATE THE TECHNICAL F ...

    SBIR Phase II 1985 Department of DefenseNavy
  8. COSITE CONFIGURATIONS SUCH AS A BEACHHEAD OR COMMAND POST CAN BE QUITE VARIABLE IN EQUIPMENT COMPLEMENT, EQUIPMENT LOCATION, FREQUENCY AVAILABILITY, ETC.

    SBC: Eastan Corp            Topic: N/A

    COSITE CONFIGURATIONS SUCH AS A BEACHHEAD OR COMMAND POST CAN BE QUITE VARIABLE IN EQUIPMENT COMPLEMENT, EQUIPMENT LOCATION, FREQUENCY AVAILABILITY, ETC. THE CONFIGURATION CAN ALSO CHANGE WITH TIME. BECAUSE OF THIS VARIABILITY IT IS DESIRABLE TO PROVIDE THE CAPABILITY TO PREDICT THE LEVEL OF INTERFERENCE. THIS PREDICTION CAPABILITY WOULD SIGNIFICANTLY AUGMENT THE COMMUNICATORS ABILITY TO BETTER MA ...

    SBIR Phase I 1985 Department of DefenseNavy
  9. ADVANCED MICROCONDUCTIVITY PROBE FOR OCEANIC USE DEVELOPMENT

    SBC: General Technology Inc            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of DefenseNavy
  10. PREPLANNED PRODUCT IMPROVEMENT PROGRAM PLAN FOR MIFASS/TCO

    SBC: Intercon Systems Corp.            Topic: N/A

    THERE IS A REQUIREMENT TO PRODUCE A PLAN TO DETERMINE THE PRODUCT IMPROVEMENT TO THE MIFASS/TCO SYSTEM, AND TO ESTABLISH A CHRONOLOGICAL IMPLEMENTATION PLAN FOR DEVELOPING AND INTEGRATING THESE PRODUCT IMPROVEMENTS. NUMEROUS SOFTWARE CAPABILITIES WERE DEFERRED OR DELETED IN THE CURRENT MIFASS ENGINEERING DEVELOPMENT. THE TCO SYSTEM HAS BEEN REDUCED IN SCOPE AND IS BEING REDEFINED. THE MARINE CORPS ...

    SBIR Phase II 1985 Department of DefenseNavy
US Flag An Official Website of the United States Government