You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Context Dependent Prognostics and Health Assessment: A New PAradigm for Condition- Based Maitenance

    SBC: 3E TECHNOLOGIES INTERNATIONAL, INC.            Topic: N/A

    In today's military environment ships, systems, and equipment are being asked to perform at levels not thought possible a decade ago. The intent is to improve process operations and equipment reliability, availability, and maintainability without costly upgrades. Of course, these gains must be achieved without impacting combat readiness. Downsizing is also taking its toll on operations. Loss o ...

    SBIR Phase I 1998 Department of DefenseNavy
  2. Augmenting CORBA with High Assurance Data Integrity Mechanisms

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    The ultimate goal of the proposed R&D is to design, develop and validate innovative CORBA-based software security services and compatible hardware architectures which provide high assurance for multi-level secure (MLS) network applications. The proposed approach is innovative in that it is based on the emerging OMG Security Services Specification (SSS) plus a proprietary technique for maintaining ...

    SBIR Phase I 1998 Department of DefenseNavy
  3. SBIR Phase I: Agent-based Simulation and Modeling Over the World Wide Web

    SBC: Agentsheets, Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
  4. SBIR Phase I: Controlled-Foam Injection for the Fracturing of Rock and Concrete

    SBC: Appl Geodynamics, Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
  5. Flight Verified Dynamic Simulation of the LCAC

    SBC: BAND, LAVIS & ASSOC., INC.            Topic: N/A

    The LCAC Full-Mission Trainer (FMT) is providing a cost-effective tool for training LCAC operators in normal craft operation and casualty mode conditions. However, the FMT was never validated with full-scale LCAC test data. Rather, the feel of the FMT was uning coefficients in response to inputs obtained from experienced LCAC operators. The FMT training schedule combined wi ...

    SBIR Phase I 1998 Department of DefenseNavy
  6. SBIR Phase I: Design of a New and Improved Print Reading Machine for the Blind

    SBC: Blazie Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1998 National Science Foundation
  7. SBIR Phase I: Software Development for Automatic Scanning and Analysis of Fluorescent Labeled Prosta

    SBC: CCC Diagnostics, LLC            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
  8. Develop New Towed Array Technology

    SBC: CHESAPEAKE SCIENCES CORP.            Topic: N/A

    Chesapeake Sciences Corporation, under contract to the Navy (NUWC) for development of a Towed Active Receive System (TARS) telemetry, proposes to study the application of the TARS telemetry to support the stated goals including commonalty with both surface ship and submarine platforms, affordability, and maximum application of previously developed commercial and Navy technology to towed array ...

    SBIR Phase II 1998 Department of DefenseNavy
  9. Technology for Affordability

    SBC: CHESAPEAKE SCIENCES CORP.            Topic: N/A

    The towed array capabilities of the US Navy combine high reliability, high channel count, long aperture and low self noise to provide an underwater acoustic superiority not matched by any other Navy. This superiority has also brought with it unwanted high production costs for these arrays. The next generation of Naval towed arrays with increasingly larger aperture may be out of the reach of a cos ...

    SBIR Phase I 1998 Department of DefenseNavy
  10. SBIR Phase I: Compact, Eyesafe LIDAR for Ozone Monitoring

    SBC: COHERENT TECHNOLOGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 National Science Foundation
US Flag An Official Website of the United States Government