You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Detecting and Correcting Adaptive and Conventional Test Compromise

    SBC: Algorithm Design & Measurement            Topic: N/A

    Project objectives briefly described: i. Improve accuracy of measurement for cheating examinees by using a scoring method that takes account of the credibility of the examinee's patterm of wrong answers. ii. Provide an adjunct to on-line calibration that would assist in timing the replacement of items. iii. Identify test sites and recruiters that are associated with high rates of item compromis ...

    SBIR Phase I 1995 Department of DefenseNavy
  2. Pulsating-flow Reverse Osmosis for Seawater Desalination

    SBC: Aetri            Topic: N/A

    Reverse Osmosis, as an effective method for recovery of fresh water from seawater by desalination, is gaining considerable attention. The problems associated with reverse osmosis process are the concentration polarization and membraine fouling, which cause the decline of membrane flux and require the use of higher system pressure and regularly cleaning. Frequent cleaning not only is a cost operat ...

    SBIR Phase I 1995 Department of DefenseNavy
  3. Propulsion Capability for 3-Inch Submarine Countermeasures

    SBC: ZIMMERMAN ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  4. AUTOMATED IMAGE AND DATA MANAGEMENT SYSTEM- AIDMS

    SBC: Analex Space Systems, Inc.            Topic: N/A

    The objective of this project is to develop new or improved systems for electronic processing and management of text and images (film and video from electron and optical microscopes. Processing electronic images with film quality creates unique problems with both analog and digital formats. Tradeoffs in cost, convenience of use, speed, flexibility and quality must be made in order to integ ...

    SBIR Phase I 1995 Department of DefenseNavy
  5. A Multi-line Towed Array as a Bearing Ambiguity Resolution Sensor (BARS)

    SBC: Applied Measurement Systems,            Topic: N/A

    Under the current U.S. Navy budget constrained environment it is desirable to get added functional performance from existing sonar systems. One such case is the need to provide instantaneous bearing ambiguity resolution for threat torpedoes at tactically significant ranges via U.S. Navy Surface Ship towed arrays. A multi-line towed array sonar system is recommended as a Bearing Ambiguity Resolut ...

    SBIR Phase I 1995 Department of DefenseNavy
  6. Submarine Low Cost Littoral Water Sonar Passive Localization System

    SBC: Applied Measurement Systems,            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  7. Wireless Communications for Mobile Robotic Systems

    SBC: The Athena Group, Inc.            Topic: N/A

    In the future, autonomous reconnaissance and surveillance tactical robotics systems (TRS) will operate individually or collectively to support a host of tasks in a continually changing environment. Advances in registration technology (e.g., GPS) will accurately locate the robot in space. Multi-sensors along with image understanding and processing systems will recognize and enhance nearby objects. ...

    SBIR Phase I 1995 Department of DefenseNavy
  8. Integration of Flat-Plate X-Band and Wideband Antennas for Surveillance/Identification

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    This proposal presents a unique and innovative approach to designing and realizing an integrated aperture made up of a wideband, nominally 0. 5 to 2. 0 GHz, array and a precision X-band array. AAEC proposes to realize the wideband element by a rigid wire structure. Second, AAEC proposes a design tool based on well validated computational electromagnetics codes that actually relate changes in the n ...

    SBIR Phase I 1995 Department of DefenseNavy
  9. Dental Conduction Hearing for Divers

    SBC: Audiodontics LLC            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  10. V-22 Automated Electrical Load Management System

    SBC: Axiom Technology            Topic: N/A

    An automated electrical load management system to provide load shedding during periods of high demand is required for adaptation to the V-22 Tilt-Rotor aircraft. A low cost and flexible system is required in order to extend current mission capabilities without significant overhaul of the electrical power system. Three steps toward solving this problem are: 1) determination of electrical load shedd ...

    SBIR Phase II 1995 Department of DefenseNavy
US Flag An Official Website of the United States Government