You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. BeaverFit

    SBC: BEAVERFIT NORTH AMERICA LLC            Topic: A234005

    Proposed Approach: BeaverFit seeks to satisfy the requirements of this proposal and subsequent SBIR phases through four main technical objectives (TO). Metrics of success will be applied to each TO to validate the effectiveness of the project and track progress toward accomplishment of the desired end state. Key measures of performance identified within the TO include cost, timelines, and throughp ...

    SBIR Phase I 2023 Department of DefenseArmy
  2. Edge AI Enabled Detection & Autonomous Tracking of Vehicles from a Rucksack Portable Fixed-Wing sUAS

    SBC: WINGXPAND INC.            Topic: A234007

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. Enhanced Ride Performance- M997A3 Chassis

    SBC: ROD HALL LICENSED PRODUCTS, LLC            Topic: A224005

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  4. Enhanced Ride Performance- M997A3 Chassis

    SBC: ROD HALL LICENSED PRODUCTS, LLC            Topic: A224005

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  5. Rapid Terrain/Map Generation for Robotic and Autonomous Vehicle Simulations

    SBC: LICKENBROCK TECHNOLOGIES, INC.            Topic: A20129

    The objective of this project is to build 3D terrain models from satellite imagery and Digital Elevation Maps (DEM) using the Unreal Engine platform. Terrain and other objects are added to the 3D model by classifying objects from RGB satellite images. The classification of objects is typically the most time-consuming step within the entire process, which is currently done manually by a user. In P ...

    SBIR Phase I 2021 Department of DefenseArmy
  6. Compact Thermal Solutions through Additive Manufacturing Techniques

    SBC: THERMAVANT TECHNOLOGIES LLC            Topic: A20007

    Under this proposed Phase I SBIR effort, ThermAvant Technologies (ThermAvant) shall design, model, prototype and analyze the thermal performance of landscaped heat sinks with integral oscillating heat pipes (OHP) and phase change material (PCM) reservoirs (collectively, OHP/PCM). Prototype OPH/PCM heat sinks shall demonstrate their unique potential to acquire, rapidly spread and isothermally store ...

    SBIR Phase I 2020 Department of DefenseArmy
  7. Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply

    SBC: LOKI INC            Topic: A19081

    The objective of this Phase II effort is to create new single use power supplies as the prime electrical sources for radio frequency transmitters installed in guided multiple launch rocket systems or 155 mm rounds, per the A19-081 Topic description. These power supplies may be reused if required. According to the Topic, in the Phase II program the power supply: Is to produce 500 kV of output volta ...

    SBIR Phase II 2020 Department of DefenseArmy
  8. Non-Explosive Non Nuclear Electro-Magnetic Pulse (EMP) Power Supply

    SBC: LOKI INC            Topic: A19081

    The overall technical objective of the phases of this effort, as stated in the solicitation, is to design and construct compact non-explosive power supplies that can be used to power HPM systems, and to conduct proof-of-principle demonstrations of those supplies. The main goal of our Phase I effort is to determine the technical feasibility of each of our proposed concepts early in the Phase, and t ...

    SBIR Phase I 2019 Department of DefenseArmy
  9. Non-Pyrotechnic Battlefield Effects Replication Using eSquibs

    SBC: Digital Solid State Propulsion, Inc            Topic: A18091

    Using electric solid propellant, DSSP has developed a non-pyrotechnic small arms fire simulator that will be optimized, enlarged and enhanced for Army live fire training applications. First, the new proprietary waterproof non-pyrotechnic propellant will be further characterized for long term use and function in eSquibs and similar devices. The eSquib muzzle flash effect will be enhanced as new var ...

    SBIR Phase II 2019 Department of DefenseArmy
  10. Dual-Voltage Lithium-Ion 6T Batteries for Low-voltage and High-voltage Applications

    SBC: SPEAR POWER SYSTEMS, INC            Topic: A18096

    The development of a modular, scalable battery system designed to support the Army’s 6T program will substantially reduce life cycle costs to the Army and DoD at large. Spear’s VoltFlex permits 6T lithium ion batteries to operate in either 24V or 48V modes. Spear’s novel switching mechanism identified in Phase I, will be further refined in Phase II and used in conjunction with the 24V and 48 ...

    SBIR Phase II 2019 Department of DefenseArmy
US Flag An Official Website of the United States Government