You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Blast Booth Noise Reduction- An OSHA Compliance Issue

    SBC: F3 SOLUTIONS LLC            Topic: AF131199

    ABSTRACT: ABSTRACT F3 Solutions (F3) is a woman owned small business with key personnel, with over a combined 50 years of experience specific to Air Force Environmental Engineering, and has experience providing research and development support to satisfy the overall objectives for blast booth noise reduction - OSHA compliance issue. F3 proposes an innovative approach to reduce employee exposu ...

    SBIR Phase I 2014 Department of DefenseAir Force
  2. Enabling Flexible Materials, Devices and Processes for Defense

    SBC: American Semiconductor, Inc.            Topic: AF121003

    ABSTRACT:Emergence and feasibility for flexible body-worn electronics and particularly medical patches requires high performance electronics capability.The problem is that these new technologies must have flexible and conformal physical formats and conventional electronic components are not in any way flexible. In the CLAS Phase I program, a new flexible high-performance manufacturing and material ...

    SBIR Phase II 2014 Department of DefenseAir Force
  3. High Range Resolution Radar for Flightline Boundary Surveillance

    SBC: PROPAGATION RESEARCH ASSOCIATES, INC            Topic: AF121026

    ABSTRACT: In Phase I, PRA working with FLIR modified the command and control (C2) software for their Ranger series of perimeter surveillance radars to meet requirements for flightline boundary surveillance. These radars are ideal for this mission with a 30 cm range resolution, >97% probability of detection, and low false alarm rate (less than 3 per 24 hours). The C2 software was modified to allow ...

    SBIR Phase II 2014 Department of DefenseAir Force
  4. Attack Amelioration via Layered Temporal Virtualizaton ("Primer")

    SBC: Computer Measurement Laboratory, LLC            Topic: AF141038

    ABSTRACT: This project will investigate the feasibility of a computing appliance which uses Temporal Virtualization to help ameliorate the effects of malicious software activity. Temporal Virtualization involves the manipulation of virtual time in Type-2 (software) virtual clients in a way that frustrates an adversary"s attempts to corrupt or break out of virtualization. An attack model is assume ...

    SBIR Phase I 2014 Department of DefenseAir Force
  5. Improved Design Package for Fracture Mechanics Analysis

    SBC: SENTIENT SCIENCE CORPORATION            Topic: AF141075

    ABSTRACT: To address the needs of the U.S. Air Force to improve existing software design packages so that they account better for short crack growth regime, Sentient proposes to incorporate its its DigitalClone-Component(DCC) modeling technology into these packages for short crack growth regime. The use of fracture mechanics to characterize the growth of fatigue cracks in metals is well establish ...

    SBIR Phase I 2014 Department of DefenseAir Force
  6. Air Launch Testbed for Endoatmospheric Hypersonic Trajectories

    SBC: GENERATION ORBIT LAUNCH SERVICES, INC.            Topic: AF141081

    ABSTRACT: Generation Orbit is proposing to develop a system architecture rooted in the success of the HIFiRE program, but capable of longer duration testing at high dynamic pressure, high Mach number flight conditions, flexible enough to maximize accessibility to customer defined test windows, while also reducing cost, risk, and schedule compared to past programs. These objectives will be accompl ...

    SBIR Phase I 2014 Department of DefenseAir Force
  7. 3-D Smart Aircraft Conceptual Design Tool

    SBC: DESIGN ANALYSIS & RESEARCH CORP            Topic: AF141083

    ABSTRACT: Design, Analysis and Research Corporation (DARcorporation) proposes to develop a 3-D visualization and modification environment as well as higher fidelity modeling capability based on defined geometry to be incorporated into the Advanced Aircraft Analysis (AAA) software. AAA is a conceptual aircraft design and analysis tool using semi-empirical and physics based methods. It is used fo ...

    SBIR Phase I 2014 Department of DefenseAir Force
  8. Galvanic Corrosion Prediction for Aircraft Structures

    SBC: Corrdesa, LLC            Topic: AF141157

    ABSTRACT: Corrdesa is validating a finite element analysis method of predicting galvanic corrosion locations and relative severity between dissimilar metals using commercially available GalvanicMaster software. This project will demonstrate that this same approach can be modified and extended to quantitatively predict corrosion rates between dissimilar materials, including metals, composites, an ...

    SBIR Phase I 2014 Department of DefenseAir Force
  9. Fuel-Air Explosive Technologies from Dual-Use Materials

    SBC: energetic materials research and engineering, llc            Topic: AF131104

    ABSTRACT: In our Phase I SBIR work to date, we constructed an implosion system using carefully-designed components and geometries that reproducibly reacts nearly 100% of the JP10 in the test cell. Using ALE3D we have also been able to qualitatively describe the major hydrodynamic processes involved in the collapse and subsequent expansion of the assembly. In Phase II we propose a continuation a ...

    SBIR Phase II 2014 Department of DefenseAir Force
  10. Biologically-inspired low light integrated vision systems

    SBC: Centeye, Inc.            Topic: AF12BT03

    ABSTRACT: Our objective is to develop a vision system for a micro air vehicle (MAV) or other robotic system that allows it to operate in extremely low light levels, including in zero light conditions and without reliance on GPS. We propose building two systems. The first system will operate primarily in the visible and NIR domain and utilize silicon based photoreceptor circuits. This system will ...

    STTR Phase II 2014 Department of DefenseAir Force
US Flag An Official Website of the United States Government