List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for the given year is not complete until April of the following year. Annual Reports data is a snapshot of agency reported information for that year and hence might look different from the live data in the Awards Information charts.

  1. SBIR Phase I: Knowledge-Based Adaptive Software Development Methodologies

    SBC: Adaptive Process Technologies            Topic: N/A

    This Small Business Innovative Research Phase I project builds on a research program investigating the design of process-based software development tools and methodologies. The project will develop a next generation of this software that supports the creation, refinement, and adaptation of software development methodologies in a principled manner while preserving the need for rapid innovation. Th ...

    SBIR Phase I 2003 National Science Foundation
  2. High Power III-Nitride Heterojunction Field-Effect Effect Transistor Development

    SBC: III-N Technology, Inc            Topic: N/A

    The research proposed here is built on the recent successful fabrication of metal oxide semiconductor heterjunction field effect transistors (MOS-HFETs) based on AlGaN/GaN heterostructures with very high drain-current-driving and gate-control capabilitiesas well as unprecedented high breakdown voltages by the P.I.s research group at Kansas State University. III-nitride HFETs have great promises i ...

    SBIR Phase I 2003 Department of DefenseMissile Defense Agency
  3. Flow Control and Operation Monitoring System for Individual Spray Nozzles

    SBC: Capstan Ag Systems, Inc.            Topic: N/A

    NON-TECHNICAL SUMMARY: Agricultural spray equipment operators typically cannot monitor all nozzles along the boom. Clogged or malfunctioning nozzles produce undesirable spraying results. This project is designed to lead directly to a useful product, namely, a single-nozzle monitoring unit for agricultural spray applications. The monitoring capabilities of the system will allow more efficient, reli ...

    SBIR Phase II 2003 Department of Agriculture
  4. Flow Control and Operation Monitoring System for Individual Spray Nozzles

    SBC: Capstan Ag Systems, Inc.            Topic: N/A

    NON-TECHNICAL SUMMARY: Agricultural spray equipment operators typically cannot monitor all nozzles along the boom. Clogged or malfunctioning nozzles produce undesirable spraying results. This project is designed to lead directly to a useful product, namely, a single-nozzle monitoring unit for agricultural spray applications. The monitoring capabilities of the system will allow more efficient, reli ...

    SBIR Phase I 2003 Department of Agriculture
  5. Multimedia Teacher Training For Community Building

    SBC: EDGE ENTERPRISES, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): The purpose of this Phase I project is to produce and pilot test the feasibility of learner-managed professional-development packages for teachers to use to learn how to create safe, supportive learning communities in their classrooms to enable students to learn the necessary social and cognitive skills to maintain ...

    SBIR Phase II 2003 Department of Health and Human Services
  6. Multimedia Writing Strategy Instruction for LD Students

    SBC: EDGE ENTERPRISES, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): The purpose of this Phase I project is to test the feasibility of using an interactive multimedia format for instructing students with learning disabilities in writing strategies. To evaluate the feasibility of this type of instruction, an instructional program for teaching four punctuation rules and the strategies associated with those rules will be designed a ...

    SBIR Phase I 2003 Department of Health and Human Services
  7. Multimedia Strategic Tutoring Training

    SBC: EDGE ENTERPRISES, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): The purpose of this Phase I project is to test the feasibility of using an interactive multimedia (IM) format for delivering professional development to adults tutors and paraprofessionals who work with students with LD and low achievement. To evaluate the feasibility of this type of instruction current professional development materials for training tutors and ...

    SBIR Phase I 2003 Department of Health and Human Services
  8. Development of a Catalytically Active Solvent for Desulfurization of Transportation Fuel

    SBC: Extractica, Llc            Topic: N/A

    72102S03-I In order to comply with current EPA regulations for reducing the level of sulfur in gasoline and diesel fuel, domestic refineries will need to install new process units for desulfurization of the fuel streams. However, current commercially available desulfurization technologies have significant energy requirements due to the severe operating conditions (such as high temperatures and p ...

    SBIR Phase I 2003 Department of Energy
  9. Developing Human-Compatible Needleless Delivery Systems for Administering Bioscavengers

    SBC: FELTON INTERNATIONAL, INC.            Topic: N/A

    The need for a rapid, reliable needle free delivery system for Hu BCHE bioscavengers is identified. The critical medical and design issues involved are presented. A needle free jet injection system is detailed. The Phase I effort comprises detailedpharmacokinetic studies and preliminary and detailed device design. The fabrication of a size appropriate injector for test rodents will also be underta ...

    SBIR Phase I 2003 Department of DefenseArmy
  10. Developing Human-Compatible Needleless Delivery Systems for Administering Bioscavengers

    SBC: FELTON INTERNATIONAL, INC.            Topic: N/A

    Phase II will focus on the design and development of a prototype needle-free injection system for administering BChE enzyme into humans to provide protection against chemical warfare agents. The Phase I proof-of-concept demonstrated the accelerateddelivery of BChE into the circulatory system using needle-free injection. The second phase of this project will consist of the following three tasks: ...

    SBIR Phase II 2003 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government