You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Conductive Composites for Electro-Magnetic Interference Composite Rigid Wall Shelter (EMI CRWS)

    SBC: Conductive Composites Company, L.L.C.            Topic: N172103

    Rigid Wall Shelters (RWS) are an integral building block for Marine Corp operations and support a multitude of operational needs from maintenance and repair operations to command posts and medical operations. There are several key operational deficiencies with metal RWS, the weight of legacy systems and lack of insulation result in a high cost to transport and difficulty heating and cooling interi ...

    SBIR Phase I 2018 Department of DefenseNavy
  2. A High Water Speed Sled for Amphibious Vehicles

    SBC: CREARE LLC            Topic: N172133

    To facilitate amphibious assault operations, the Marines need to quickly move amphibious combat vehicles (ACVs) between ships and the shore. However, due to an increased level of sophistication in the anti-ship weapons available to potential adversaries, Navy ships must remain far from shore during assault operations (i.e., many tens of miles). This creates a need for assault vehicles that can ach ...

    SBIR Phase I 2018 Department of DefenseNavy
  3. A Novel Thermal Management System for MIDS JTRS Terminals

    SBC: CREARE LLC            Topic: N172137

    The Multifunctional Information Distribution System (MIDS) Joint Tactical Radio (JTRS) is a four-channel, software-programmable radio having up to eight Shop Replaceable Units (SRUs) that determine the functionality of the unit. The SRUs consist of electronics cards mounted in a sealed structure and secured in the chassis using standard wedge locks. Currently, the available heat rejection from the ...

    SBIR Phase I 2018 Department of DefenseNavy
  4. Applying Advanced Human Engineering Methods to Mission Planning for Multi-Manned or Unmanned Air Vehicles

    SBC: MONTEREY TECHNOLOGIES INC            Topic: N141019

    The proposed Phase II.5 ViPER USMC large mission planning mission planning expansion effort seeks to add capabilities to ViPER-CVW that will provide an initial large force air planning capability to USMC aviation planners. Development will focus on providing route and airspace deconfliction tools which link airspace, flight routing, and planned aircraft movements, as well as automated checks to en ...

    SBIR Phase II 2018 Department of DefenseNavy
  5. SBIR Phase I: Development of a Novel Antibiotic-Alternative Treatment for a Devastating Honey Bee Disease

    SBC: Esplin Organic Solutions, LLC            Topic: BT

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) project is the development of potentially the first FDA-approved phage therapeutic, non-antibiotic remedy specifically designed for honeybees. This treatment has the potential to become the global gold standard for treating American Foulbrood, a devastating honey bee disease caused by the bacteria Paenibacill ...

    SBIR Phase I 2018 National Science Foundation
  6. SBIR Phase I: Helping Students Acquire 21st Century Skills Through Immersive Group STEM Simulations

    SBC: Discovery Simulations, LLC            Topic: EA

    This Small Business Innovation Research Phase I project will automate an experiential simulation learning lab by funding the technical conversion from what is essentially a hardwired product requiring a dedicated lab available to schools within a limited geographic area to a nationally available online product. Additionally, the funding will drive the technological innovation necessary to maintain ...

    SBIR Phase I 2018 National Science Foundation
  7. SBIR Phase II: Multifunctional Reconfigurable Antenna Array Technology for Wi-Fi and 5G Small Cell Access Points

    SBC: I5 TECHNOLOGIES INC            Topic: EW

    The broader impact/commercial potential of this project is its capability to create a positive impact on current and future wireless systems. Multifunctional reconfigurable antenna (MRA) technology targeted in this project enables a single antenna element to dynamically change its frequency band, radiation pattern and polarization properties, which directly impact the radio-frequency (RF) coverage ...

    SBIR Phase II 2018 National Science Foundation
  8. Power Factor Correction

    SBC: ELECTRIC DRIVETRAIN TECHNOLOGIES LLC            Topic: N181005

    The Navy seeks to improve the reliability and the operating life of its airborne Generator Converter Unit.The goal is to develop lightweight and compact equipment to correct leading power factor in a military combat aircrafts power 65kVA, 115V, 400Hz, 3-phase power distribution system. The equipment will correct the power factor from .98 leading to a minimum .97 lagging while complying with Milita ...

    SBIR Phase I 2018 Department of DefenseNavy
  9. Open Architecture Tools to Describe Automatic Test Equipment (ATE) Capabilities

    SBC: WESTEST ENGINEERING CORP            Topic: N181009

    Develop innovative methods and associated tools to support the definition of Automatic Test Equipment (ATE) capabilities and their individual instruments using an Open Architecture (OA) approach, to allow for precise understanding of the ATE, interoperability across Navy and DoD electronics maintenance, and improved utilization of Commercial Off-The-Shelf (COTS) tools to support ATE operations. Th ...

    SBIR Phase I 2018 Department of DefenseNavy
  10. Multispectral/Hyperspectral Imaging System for Small Boat Detection under Wake Clusters

    SBC: NEXTGEN IMAGING TECHNOLOGIES INC            Topic: N181023

    The innovation is a Gimbaled Airborne Multi-Sensing Imaging System (GAMSIS) optimized for small boat detection under wake clusters. The system tightly integrates GPS/INS to operate its co-boresighted multi-sensor payload, consisting of an array of fast high resolution Electro-Optical/Infrared (EO/IR) cameras capable of multispectral/hyperspectral/polarimetry snapshot over a broad VIS-LWIR range (4 ...

    SBIR Phase I 2018 Department of DefenseNavy
US Flag An Official Website of the United States Government