You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Synthetic Environment Tool for Virtual Battlespace 2 (VBS2)

    SBC: ENOMALIES, LLC            Topic: N132130

    This proposal is in response to rapid modeling need in our military force. We plan to develop and demonstrate a framework that will allow warfighters to rapidly acquire and edit geospecific terrain databases, including both building exterior and interiors. The output of our models will be in standard 3D format, which can be used in a variety of simulation and training software, including VBS2. We ...

    SBIR Phase I 2014 Department of DefenseNavy
  2. Electro-Optic and Infrared Situational Awareness Display

    SBC: HITRON TECHNOLOGIES INC            Topic: N132110

    To address a Navy need for a high resolution full color situational awareness displays to optimize human interface for Navy personnel, ships, and crafts, Hitron Technologies Inc. proposes to develop a see-through full color transparent flexible display with collaboration of Liquid Crystal Institute of Kent State University. The transparent flexible display is based on innovative integration of a f ...

    SBIR Phase I 2014 Department of DefenseNavy
  3. Selective Availability Anti-Spoofing Module (SAASM) Compliant GPS Receiver for GEO

    SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC            Topic: AF141113

    The objective of this proposal is to develop Selective Availability Anti-Spoofing Module (SAASM) compliant GPS receiver for Geosynchronous Earth Orbit (GEO) applications. In this proposal, we explore an approach to design the GEO GPS SAASM receiver based on improved techniques for signal acquisition (or detection) and then signal tracking (and demodulation) of weak GPS signals. GPS signals availa ...

    SBIR Phase I 2014 Department of DefenseAir Force
  4. Acoustic Array Simulation Environment System

    SBC: SOFTRONICS, LTD.            Topic: N122108

    The proposed effort will design and build a 64 channel ASW test/training system that relays individual sonobuoy acoustic data from a master scenario generator to each randomly located/drifting relay sonobuoy. The data is retransmitted as simulated sonobuoy data for purposes of training and testing. This adds a degree of realism to test and training previously unavailable, and is a valid substitute ...

    SBIR Phase II 2014 Department of DefenseNavy
  5. Power-Dense Lightweight Hydro Turbine/Generators for 20,000+ Low-Head US Dams and Reclamation Conduits that Install In-Line,are Low Cost and Mass Producible

    SBC: Amjet Turbine Systems, LLC            Topic: 07b

    There is a manifest need in the US and the world for renewable, lowcost energy. However, conventional and small hydropower systems for (20,000+) low head dams (550ft.) in the US tend to be extremely costintensive due to a variety of configurational issues. These include coffer dams, power houses, complex foundations, complex unit maintenance, large space requirements, and turbine technology requir ...

    SBIR Phase II 2014 Department of Energy
  6. Late Award- Nanocomposite Coatings for Low-Cost Motor Windings in Electric Vehicles

    SBC: ENGI-MAT CO            Topic: 06g

    Electric vehicles, including hybrids in the nearer term, are the principal transportation technology by which the United States can become independent of foreign oil, can become energy independent overall, and can effect control over greenhouse emissions. For this to become reality, electric vehicle costs need to come down and performance needs to improve. For electric vehicle motors, the goals ...

    SBIR Phase II 2014 Department of Energy
  7. Direct Digital Secondary Electron Signal Acquisition Probe for Scanning Electron Microscope.

    SBC: SCIENCETOMORROW LLC            Topic: 08a

    ScienceTomorrow in collaboration with Dr. David C Joy, at the University of Tennessee Research is proposed to fabricate direct digital Quantitative Secondary Electron Detectors (QSED) for scanning electron microscopes (SEMs). If successful, commercial versions of the QSED would transform the SEM/STEM into a quantitative, metrological tool with enhanced capabilities that, in turn, would broaden re ...

    SBIR Phase II 2014 Department of Energy
  8. Multiple-stage activated-char filtration

    SBC: Advanced Renewable Technology International Inc            Topic: 02c

    Less than 1% of the worlds water is considered freshwater. Population growth and intensive use in cities and agro industrial activities threatens the depletion of this resource in many parts of the world. This depletion poses many major social and economic concerns. As a result, efforts have been made to develop economically viable technologies to make potable water from seawater or brackish water ...

    STTR Phase I 2014 Department of Energy
  9. Reliability-Based Design Optimization Software Package for Broader Simulation-Based Design Applications

    SBC: RAMDO Solutions, LLC            Topic: A14075

    It is critical to the US Army to have reliable ground vehicles that can be relied on to demonstrate consistently high levels of performance for survivability, mobility, and durability under a wide range of operational conditions without being subject to unanticipated premature failure, and with substantially reduced maintenance requirements. In response to critical Army needs and dual use in comm ...

    SBIR Phase I 2014 Department of DefenseArmy
  10. High Power, Long Endurance MnO2/CFx Battery for Sonobuoys Based on Interpenetrating Conductive Network

    SBC: Nanowise LLC            Topic: N142110

    The need for the United States Navy to maintain a superior global Anti-Submarine Warfare capability is heavily dependent on sonobouys and Navy has identified a need to develop batteries to power sonobuoys which have higher power capabilities than currently used technology. Nanowise LLC proposes to develop a high power MnO2/CFx battery based on interpenetrating conductive network of nanostructures. ...

    SBIR Phase I 2014 Department of DefenseNavy
US Flag An Official Website of the United States Government