You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Rapid Synthetic Environment Tool for Virtual Battlespace 2 (VBS2)
SBC: ENOMALIES, LLC Topic: N132130This proposal is in response to rapid modeling need in our military force. We plan to develop and demonstrate a framework that will allow warfighters to rapidly acquire and edit geospecific terrain databases, including both building exterior and interiors. The output of our models will be in standard 3D format, which can be used in a variety of simulation and training software, including VBS2. We ...
SBIR Phase I 2014 Department of DefenseNavy -
Electro-Optic and Infrared Situational Awareness Display
SBC: HITRON TECHNOLOGIES INC Topic: N132110To address a Navy need for a high resolution full color situational awareness displays to optimize human interface for Navy personnel, ships, and crafts, Hitron Technologies Inc. proposes to develop a see-through full color transparent flexible display with collaboration of Liquid Crystal Institute of Kent State University. The transparent flexible display is based on innovative integration of a f ...
SBIR Phase I 2014 Department of DefenseNavy -
Advanced Littoral Combat Ship Common Mission Module Handling Device
SBC: Quantum Engineering Design, Inc. Topic: N132120The Quantum Engineering Design, Inc. (QED) Mission Module Handling Device (MMHD) is designed to meet the Navys requirements of minimizing the deck point loading while lifting and omni-directionally maneuvering ISO containers and Twenty foot Equivalent Units (TEUs) aboard both the Littoral Combat Ship (LCS) Freedom and Independence class of vessel. Special attention is paid to the need for operatin ...
SBIR Phase I 2014 Department of DefenseNavy -
Selective Availability Anti-Spoofing Module (SAASM) Compliant GPS Receiver for GEO
SBC: MINERVA SYSTEMS & TECHNOLOGIES LLC Topic: AF141113The objective of this proposal is to develop Selective Availability Anti-Spoofing Module (SAASM) compliant GPS receiver for Geosynchronous Earth Orbit (GEO) applications. In this proposal, we explore an approach to design the GEO GPS SAASM receiver based on improved techniques for signal acquisition (or detection) and then signal tracking (and demodulation) of weak GPS signals. GPS signals availa ...
SBIR Phase I 2014 Department of DefenseAir Force -
Advanced Breakwater And Causeway Ultramarine System (ABACUS) Development
SBC: Quantum Engineering Design, Inc. Topic: N092156Expansion of the Advanced Breakwater And Causeway Ultramarine System (ABACUS) research and development work accomplished under the Phase II Basic and Options 1 & 2 programs to full scale prototype systems and large scale demonstration models for both Seabasing and ship-to-shore logistics support operations. The ABACUS family of systems support a) the mitigation of waves about Sealift ships at the ...
SBIR Phase II 2014 Department of DefenseNavy -
Active Motion-Compensation Technology for Roll-On/Roll-Off Cargo Vessel Discharge to Floating Platforms
SBC: Quantum Engineering Design, Inc. Topic: N112137The QED team proposes to study an active motion compensation platform supported by a self-contained air cushion system. The Phase II study will evaluate the ability of the 'Ramp Motion Control Platform' (RMCP) to support and control the LMSR stern ramp through a range of elevated sea state conditions while maintaining its structural integrity within safe limits. The study will focus on the sensing ...
SBIR Phase II 2014 Department of DefenseNavy -
Practical Roots of Trust for Mobile Devices
SBC: GALOIS, INC. Topic: HSB0132002To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...
SBIR Phase II 2014 Department of Homeland Security -
Programmable, Reconfigurable Silicon Photodiode Array Module
SBC: VOXTEL, INC. Topic: 34cMany planned nextgeneration experiments in high energy physics, astroparticle physics, and nuclear physics need a plethora of photon detectors with singlephoton sensitivity, large dynamic range, and accessibility throughout experiment lifetime. These requirements constrain the sensor: low sensitivity against temperature and bias fluctuations; very compact; very robust; cheap; insensitive to magn ...
SBIR Phase I 2014 Department of Energy -
Rock Melt Borehole Sealing System
SBC: Re/Spec Inc. Topic: 21aDeep geological disposal is a promising and widely accepted method for long- term disposal of nuclear waste and the option of deep borehole disposal is considered an inherently safe method. The feasibility of the deep borehole option relies upon the design and construction of an effective seal within the borehole that ensures the waste package does not communicate for thousands of years with the s ...
SBIR Phase I 2014 Department of Energy -
Late Award- Nanocomposite Coatings for Low-Cost Motor Windings in Electric Vehicles
SBC: ENGI-MAT CO Topic: 06gElectric vehicles, including hybrids in the nearer term, are the principal transportation technology by which the United States can become independent of foreign oil, can become energy independent overall, and can effect control over greenhouse emissions. For this to become reality, electric vehicle costs need to come down and performance needs to improve. For electric vehicle motors, the goals ...
SBIR Phase II 2014 Department of Energy