You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A HIGH RANGE PARTICLE VELOCITY TRANSDUCER DEVELOPMENT

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THERE IS AN ESTABLISHED NEED FOR A SIMPLE ROBUST TRANSDUCER TO MEASURE PARTICLE VELOCITY IN SEVERE BLAST AND SHOCK ENVIRONMENTS SUCH AS NUCLEAR AND HIGH EXPLOSIVE TESTS. A GAGE CONCEPT IS PROPOSED FOR DEVELOPMENT, BASED ON THE PROVEN MEASUREMENT PRINCIPLES USED IN THE HIGHLY SUCCESSFUL DX GAGE, BUT RECONFIGURED MECHANICALLY AND ELECTRICALLY TO WITHSTAND THE HARSH SHOCK ENVIRONMENTS. THE CONCEPT RE ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  2. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    HIGH RANGE (200,000 G) ACCELEROMETERS ARE THE ONLY TRANSDUCERS THAT PROVIDE THE REQUIRED LONG-TERM DATA IN THE ENVIRONMENTS OF INTEREST TO THE BLAST AND SHOCK COMMUNITY. THESE GAGES HAVE A VERY LARGE DYNAMIC RANGE AND NOISE OFTEN MASKS THE LATE TIME (BUT EXTREMELY IMPORTANT) DATA. WE PROPOSE TO DEVELOP A CLOSE COUPLED LOGARITHMIC GAIN SIGNAL CONDITIONING SYSTEM THAT WILL CORRECT THE LATE TIME NOIS ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  3. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    A FEASIBILITY STUDY OF IMPROVING DECOY PENETRATION AID (PENAID) PERFORMANCE BY SUPPLYING MEANS TO 1) ALLOW FOR DUAL CENTER OF GRAVITY (CG) LOCATION, THEREBY ENABLING INDEPENDENT FULFILLMENT OF IMPULSE BALANCING AND REENTRY STABILITY REQUIREMENTS; AND/OR 2) COUNTERACT DECOY CONING BY SENSING ITS PRESENCE, AND CORRECTING THE ANGULAR MOMENTUM OF THE DECOY TO ELIMINATE CONING.

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  4. SENSITIVE LOW Z STRAIN GAGE

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  5. UGT INSTRUMENTATION FOR ELECTRICAL PARAMETER MEASUREMENT

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  6. A CRYOGENIC DEBRIS SHIELD FOR HIGH-FLUENCE SOFT X-RAY TESTING

    SBC: BERKELEY RESEARCH ASSOC., INC.            Topic: N/A

    A DEBRIS SHIELD MADE FROM SOLID HYDROGEN TRANSMITS MOST OF THE SOFT X-RAYS AROUND 1 KEV PRODUCED BY A PLASMA RADIATION SOURCE. THE PROPOSAL SETS OUT TO VERIFY EXPERIMENTALLY THAT SUCH A DEBRIS SHIELD IS TECHNOLOGICALLY FEASIBLE, AND ESTIMATES THEORETICALLY THE BEHAVIOR OF THE SHIELD IN A TEST ENVIRONMENT.

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  7. A TIME-RESOLVED HARD X-RAY SPECTROMETER

    SBC: BERKELEY RESEARCH ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  8. A PROPOSAL TO INVESTIGATE PHYSICAL LIMITING MECHANISMS IN NUCLEAR EXPLOSION INDUCED LIGHTNING (NEIL)

    SBC: Electro Magnetic            Topic: N/A

    NUCLEAR EXPLOSION INDUCED LIGHTNING (NEIL) REPRESENTS A POTENTIALLY SEVERE THREAT TO MILITARY SYSTEMS REQUIRED TO SURVIVE AND FUNCTION AFTER EXPOSURE IN THE SOURCE REGION OF A NUCLEAR EXPLOSION. WHEREAS THERE EXISTS SOME UNCERTAINTY ABOUT THE NATURE AND MAGNITUDE OF THE THREAT, ITS EXISTENCE IS CONCLUSIVELY DOCUMENTED IN THE FILM RECORD OF ATMOSPHERIC NUCLEAR TESTS IN THE PACIFIC DURING THE 1950'S ...

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  9. HIGH BANDWIDTH ACCELEROMETER FOR SHOCK ENVIRONMENTS

    SBC: GEO-CENTERS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
  10. A TECHNICAL HYPERTEXT SYSTEM

    SBC: Horizons Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseDefense Threat Reduction Agency
US Flag An Official Website of the United States Government