You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Miniature Adsorption Blast-Freezer for Use in Space

    SBC: Rocky Research            Topic: N/A

    Adsorption refrigeration using ammoniated complex compounds as the absorbent media can be used for miniature portable blast freezers. This is possible because the technology allows low evaporator temperatures without staging, is scalable to small sizes, and has high reliability because the only moving parts are check valves. Compared to vapor compression or other sorption refrigeration systems, th ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  2. Real-Time Wavelet-Based Image Compression

    SBC: Summus, Ltd.            Topic: N/A

    The objective of this effort is to develop low-cost wavelet-based compression algorithms, for transmitting real-time video data over noisy narrow bandwidth radiolinks. These algorithms will incorporate a variety of supplemental image processing capabilities, such as adaptive focusing, smooth magnification, contrast enhancement, and noise removal. The algorithms will be demonstrated in software and ...

    SBIR Phase I 1994 Department of DefenseNavy
  3. Uniflow Two-Cycle Aero-Diesel Powerplant

    SBC: GS ENGINEERING INC            Topic: N/A

    This proposal outlines the design and development of a uniflow two stroke Aero-Diesel engine core in response to the NASA SBIR solicitation for a general aviation aircraft propulsion system. The proposed engine will offer increased power density, simplified operation, reduced emissions, noise, and vibration, while enhancing reliability and safety when compared to currently available general aviati ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  4. THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM.

    SBC: Arbus, Inc.            Topic: N/A

    THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM. THIS WILL BE ACCOMPLISHED BY INVESTIGATING THE USE OF A TAPERED OR CONICAL DESIGN TO INCLUDE A PRELIMINARY LATCHING FEATURE TO CAPTURE AND TO CAUSE ALIGNMENT OF A PAIR OF COMPLEMENTARY CONNECTORS. THE INVESTIGATION WILL TAKE INTO CONSIDE ...

    SBIR Phase I 1984 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government