You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low SWaP-C, Flight-Capable Distributed Fiber-Optic Sensing Platform
SBC: SEQUENT LOGIC LLC Topic: A2The firm proposes to perform studies related to size, weight, power, cost reduction, and ruggedizationnbsp;of a flight-capable, multi-parameter distributed fiber-optic sensing interrogator for testing advanced flight vehicles including those pertaining to NASArsquo;s Integrated Aviation Systems Program (IASP) Flight Demonstrations and Capabilities (FDC) project. The technology will aid understandi ...
SBIR Phase I 2023 National Aeronautics and Space Administration -
Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Insole-based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance with GPS Denied Tracking Capablities
SBC: NANO COMPOSITE PRODUCTS, INC Topic: A224025Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
DES- Advanced Circuit Breaker Tech for PDM Solutions
SBC: DEFENSE ENGINEERING SERVICES LLC Topic: A224021Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Enzyme Fuel Cell Power Generation System
SBC: ELECTRIC DRIVETRAIN TECHNOLOGIES LLC Topic: A224019Redacted
SBIR Phase II 2023 Department of DefenseArmy -
MetalScrap: A Multimodal and Multiview Digital Image Deep Learning Method for Automated and Accurate Metallic Scrap Inspection
SBC: INFOBEYOND TECHNOLOGY LLC Topic: A214043Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Sustainable Geopolymer Concrete (GPC) using Indigenous and Waste Materials
SBC: HIFUNDA LLC Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Alane-powered Carbon-Free 50W Soldier Power Generator (C-SPG)
SBC: FUELX INNOVATION INC Topic: A224020Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Armament System AI Data Logger & Architecture
SBC: ALTRON, INC. Topic: A224002Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Tool-Agnostic Digital Engineering Platform Ontology Design
SBC: ISTARI, INC. Topic: A22002We propose to build a Tool-Agnostic Digital Engineering Platform Ontology that will allow for faster and more intelligent use of digital engineering tools and allow non-subject matter experts to leverage models and simulations expertly. Our approach has three novel aspects to it: First, the Tool-Agnostic Digital Engineering Platform Ontology will be designed such that the models and digital ...
SBIR Phase I 2023 Department of DefenseArmy