You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Low SWaP-C, Flight-Capable Distributed Fiber-Optic Sensing Platform

    SBC: SEQUENT LOGIC LLC            Topic: A2

    The firm proposes to perform studies related to size, weight, power, cost reduction, and ruggedizationnbsp;of a flight-capable, multi-parameter distributed fiber-optic sensing interrogator for testing advanced flight vehicles including those pertaining to NASArsquo;s Integrated Aviation Systems Program (IASP) Flight Demonstrations and Capabilities (FDC) project. The technology will aid understandi ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  2. Insole based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance

    SBC: NANO COMPOSITE PRODUCTS, INC            Topic: A224025

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  3. Insole-based Physiological Gait Monitoring for Injury Prevention and Personalized Training for Increased Performance with GPS Denied Tracking Capablities

    SBC: NANO COMPOSITE PRODUCTS, INC            Topic: A224025

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  4. DES- Advanced Circuit Breaker Tech for PDM Solutions

    SBC: DEFENSE ENGINEERING SERVICES LLC            Topic: A224021

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  5. Enzyme Fuel Cell Power Generation System

    SBC: ELECTRIC DRIVETRAIN TECHNOLOGIES LLC            Topic: A224019

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  6. MetalScrap: A Multimodal and Multiview Digital Image Deep Learning Method for Automated and Accurate Metallic Scrap Inspection

    SBC: INFOBEYOND TECHNOLOGY LLC            Topic: A214043

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  7. Sustainable Geopolymer Concrete (GPC) using Indigenous and Waste Materials

    SBC: HIFUNDA LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  8. Alane-powered Carbon-Free 50W Soldier Power Generator (C-SPG)

    SBC: FUELX INNOVATION INC            Topic: A224020

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  9. Armament System AI Data Logger & Architecture

    SBC: ALTRON, INC.            Topic: A224002

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  10. Tool-Agnostic Digital Engineering Platform Ontology Design

    SBC: ISTARI, INC.            Topic: A22002

    We propose to build a Tool-Agnostic Digital Engineering Platform Ontology that will allow for faster and more intelligent use of digital engineering tools and allow non-subject matter experts to leverage models and simulations expertly.  Our approach has three novel aspects to it:   First, the Tool-Agnostic Digital Engineering Platform Ontology will be designed such that the models and digital ...

    SBIR Phase I 2023 Department of DefenseArmy
US Flag An Official Website of the United States Government