You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Infini-D Summits: An Online Platform for Immersive Full-Class Literacy Simulations

    SBC: INFINID LEARNING INC            Topic: 91990023R0011

    Not available

    SBIR Phase I 2023 Department of EducationInstitute of Education Sciences
  2. Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets

    SBC: 60Hertz Incorporated            Topic: 92

    This research aims to develop decision support tools for better maintenance and planning of renewable energy generation and storage assets using atmospheric, local weather, and on-ground environmental data blended with site-, regional- and national-generation data. The study will use a combination of these data to understand the relationship between non-cloud cover based atmospheric conditions and ...

    SBIR Phase II 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Artificial Intelligence (AI) based algorithms for predictive maintenance using NOAA data-sets for renewable energy assets

    SBC: 60Hertz Incorporated            Topic: 92

    We propose to use Aerosol Optical Depth (AOD) measurements as an early warning system, to cue on-site validation of the soiling station and any available meteorological (MET) station data to validate if a work order to clean deposited particulate matter is necessary. This would move from reactive maintenance – often weeks delayed, to proactive maintenance – getting ahead of the weather impact ...

    SBIR Phase I 2022 Department of CommerceNational Oceanic and Atmospheric Administration
  4. LoomVue Browser: Supporting Language Learning with a Dynamic Diglot Weave

    SBC: KING'S PEAK TECHNOLOGY, INC.            Topic: 91990021R0003

    Not available

    SBIR Phase II 2021 Department of EducationInstitute of Education Sciences
  5. LoomVue Browser: Supporting Language Learning with a Dynamic Diglot Weave

    SBC: KING'S PEAK TECHNOLOGY, INC.            Topic: 91990020R0006

    This project will develop a prototype of an online program to support students in middle and high school who are English learners (ELs) in reading passages in English. The prototype will present passages as diglot weave texts. These texts are created by blending English and Spanish words together, with passages continually changing as readers gain skill in the target language. The prototype will i ...

    SBIR Phase I 2020 Department of EducationInstitute of Education Sciences
  6. Development of “Permit Wizard” Software for AssistedPermit Application Completion

    SBC: TOTAL QUALITY SYSTEMS, INC.            Topic: 833

    TECHNICAL ABSTRACT: The objective of this project is to research the technical feasibility of designing a software tool “Permit Wizard” that will automate the process for aquamarine permit application submittal, review, approval/disapproval and issue (including collection of fees). Aquaculture producers are currently faced with slow, complex, and often confusing permitting processes that must ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government