You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 1 - 10 of 7520 results
  1. Superconducting Undulator Test Cryostat Development

    SBC: CRYOMAGNETICS INC            Topic: C5506a

    C55-06a-270224-AbstractDemand for increased brightness of synchrotron light sources has been driven by advances in novel experimental techniques studying nanomaterials, micro- and nanocrystals, and interactions of atomic and molecular structures. Strong demand has pushed technologies of low emittance electron sources, novel concepts in electron storage rings, free electron lasers (FELs) and undula ...

    SBIR Phase I 2023 Department of Energy
  2. Wire-Arc Additive Manufacturing and Wire-Arc ThermalSpray Methods to Clad Nuclear-Reactor Materials

    SBC: NANOCOATINGS INC            Topic: C5512a

    The Department of Energy (DOE) requires the demonstration of bimetallic corrosion-resistant surfaces for structural and cooling components used in molten-salt nuclear-reactor systems. Proposed coating materials must survive thermo-mechanical loading (e.g., no flaking or spalling) during exposure to the high-temperature conditions encountered during reactor operation and maintain metallurgical stab ...

    SBIR Phase I 2023 Department of Energy
  3. Superconducting Undulator Test Cryostat Development

    SBC: CRYOMAGNETICS INC            Topic: C5506a

    C55-06a-270224-AbstractDemand for increased brightness of synchrotron light sources has been driven by advances in novel experimental techniques studying nanomaterials, micro- and nanocrystals, and interactions of atomic and molecular structures. Strong demand has pushed technologies of low emittance electron sources, novel concepts in electron storage rings, free electron lasers (FELs) and undula ...

    SBIR Phase I 2023 Department of Energy
  4. Wire-Arc Additive Manufacturing and Wire-Arc ThermalSpray Methods to Clad Nuclear-Reactor Materials

    SBC: NANOCOATINGS INC            Topic: C5512a

    The Department of Energy (DOE) requires the demonstration of bimetallic corrosion-resistant surfaces for structural and cooling components used in molten-salt nuclear-reactor systems. Proposed coating materials must survive thermo-mechanical loading (e.g., no flaking or spalling) during exposure to the high-temperature conditions encountered during reactor operation and maintain metallurgical stab ...

    SBIR Phase I 2023 Department of Energy
  5. A low-cost holographic sensor for urban aerosol characterization

    SBC: CLOUDSCI LLC            Topic: C5516a

    Coarse mode aerosol are an understudied but potentially important component of urban aerosols that affect climate and human health. They are highly relevant to DOE’s interest in improving understanding and resiliency related to climate change impacts on urban areas. Coarse mode aerosol can vary spatially and temporally over urban landscapes due to the large range of coarse mode aerosol emission ...

    SBIR Phase I 2023 Department of Energy
  6. In-Field Magnetometry for Determination of Lithium Battery SOC

    SBC: TDA RESEARCH, INC.            Topic: 23PH3

    By 2030 the entire lithium-ion battery chain, from mining through recycling, is expected to reach a value of $400 billion and a market size of 4.7 TWh. LiB are used in personal electronic devices, e-bikes, tools, green-power storage and electric vehicles. Individual cells are commonly collected into packs or modules to provide the power required for automotive operation. The operational capability ...

    SBIR Phase I 2023 Department of Transportation
  7. SBIR Phase I:A novel clot removal system for improved Venous Thromboembolism (VTE) thrombectomy outcomes

    SBC: XTRACT MEDICAL INC            Topic: MD

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is a novel system for treating Venous Thromboembolism (VTE), a clot in the patient’s deep veins or pulmonary arteries which blocks blood flow, in a more effective manner. Each year 1.2 million Americans are affected by VTE resulting in 100,000 deaths, $10 billion of direct medical costs, and ...

    SBIR Phase I 2023 National Science Foundation
  8. SBIR Phase I:Radar Snow Retrieval

    SBC: Baxter Vieux            Topic: AA

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project will develop transformative, machine-learning algorithms that will improve water management. Water management is critically important to the social well-being, food supply, and climate resiliency of the local population in the Western United States, yet water managers lack adequate snowpack de ...

    SBIR Phase I 2023 National Science Foundation
  9. SBIR Phase I:Rapid, End-to-end Sample Preparation for Sequencing Applications

    SBC: MICROPURE GENOMICS INC.            Topic: BM

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project consists of advancing methods for preparing deoxyribonucleic acid (DNA) for sequencing. Prior to sequencing a biological sample, DNA must be liberated from cells and separated from proteins and other unwanted debris, and then mixed with specialty buffers and chemical agents. This skilled task ...

    SBIR Phase I 2023 National Science Foundation
  10. SBIR Phase I:Renewable platinum catalyst for fuel cell applications

    SBC: FC RENEW, LLC            Topic: EN

    The broader impact/commercial potential of this Small Business Innovation Research (SBIR) Phase I project is to overcome a limiting step in creating viable hydrogen fuel cells for the automotive industry. The solution will renew the battery catalyst without its removal from the vehicle. This will result in significant savings toward the total cost of ownership and an increase in overall system rel ...

    SBIR Phase I 2023 National Science Foundation
US Flag An Official Website of the United States Government