You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Faster Optical Modem for Underwater Data Acquisition

    SBC: SA PHOTONICS, LLC            Topic: NGA182001

    SA Photonics’ Optical Navigation and Ranging (ONAR) system is an interrogative system that operate underwater in wavelength range of blue/green (450-540 nm) and enables navigational correction to IMU based dead reckoning navigation. The location based beacons are battery operated and have operational life span of over one year. The system is designed to operate in on demand burst mode so that no ...

    SBIR Phase I 2019 Department of DefenseNational Geospatial-Intelligence Agency
  2. Unsupervised Techniques for SAR Imagery: Feature Learning, Encoding, and Extraction Toolkit (FLEET)

    SBC: Applied Research In Acoustics LLC            Topic: NGA191001

    To support geospatial intelligence (GEOINT) through exploitation and analysis of synthetic aperture radar (SAR) imagery and address the challenges created by task-specific classification methodologies where feature extraction is mission-limited, ARiA will utilize deep learning (DL) expertise to enable automated unsupervised feature extraction (AUFE). Building upon our development of unsupervised D ...

    SBIR Phase I 2019 Department of DefenseNational Geospatial-Intelligence Agency
  3. A Multi-Branch Network for Automated VNIIRS Assessment of Motion Imagery

    SBC: TOYON RESEARCH CORPORATION            Topic: NGA191003

    Due to the lack of consistency in existing automated methods for assigning VNIIRS levels to motion imagery, and the overwhelming human resources required to manually assign levels, a new method of automated/semi-automated VNIIRS assessment is needed. In recent years, advancements in deep learning have provided solutions to previously intractable computer vision problems. In many cases, automated d ...

    SBIR Phase I 2019 Department of DefenseNational Geospatial-Intelligence Agency
  4. SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY

    SBC: Center For Planning & Research            Topic: N/A

    AN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS

    SBC: Expert-ease Systems            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. "SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"

    SBC: Fluid Physics Ind.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE CANDY CANE HOT LEG OF A B&W PLANT. THE PROPOSED PHASE I WORK PLAN CONSISTS OF (A) REVIEWING AVAILABLE WESTINGHOUSE EXPERIMENTAL DATA AND SIMULATING THE EXPERIMENTAL CONFIGURATION, (B) VALIDATING THE M ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. AGING PROCESSES IN NUCLEAR REACTORS

    SBC: Pdi Technology Inc            Topic: N/A

    AS NUCLEAR PLANTS GROW OLDER, ENVIRONMENTAL CONDITIONS MAY AFFECT THE PERFORMANCE OF PLANT CONCRETE AND STEEL STRUCTURES. WE PROPOSE TO DEVELOP A STRATEGY WHICH CAN BE APPLIED TO CONCRETE STRUCTURES. IT WILL BE DIRECTED TOWARDSTHE DEVELOPMENT OF METHODS TO ANALYZE AND UNDERSTAND AGING EFFECTS, INCLUDING THE COMBINED EFFECTS OF TIME, TEMPERATURE, RADIATION, HUMIDITY, STRESS, CHEMICAL ENVIRONMENT AN ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government