You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. "EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  2. METHODS TO UNDERSTAND AND ANALYZE AGING EFFECTS

    SBC: Sea Consultants            Topic: N/A

    IN ORDER TO DEVELOP AN ACCURATE, ANALYTICAL REPRESENTATION OF THE EQUIPMENT AGING PROCESS, THE INTERACTIVE EFFECTS OF TTHE AGING PHENOMENON MUST BE UNDERSTOOD. FOR COMPLEX EQUIP MENT, THE INTERACTIVE EFFECT CAN BE DETERMINED BY PARTITION ING THE EQUIPMENT INTO SMALLER REPLACEABLE PARTS, DEFINING THE AGING AFFECTRS ON THE PARTS, AND THEN COMBINING THE PARTLEVEL EFFECTS TO REFLECT THE ASSEMBLED EQUI ...

    SBIR Phase II 1986 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government