You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Daytime Marker

    SBC: Pranalytica, Inc.            Topic: A09AT007

    Pranalytica will develop and provide an integrated target marker that includes marking capabilities at NIR wavelengths and out-of-band MWIR wavelengths, making it backward compatible with existing earlier generation imagers as well as with the newer imagers that provide critical advantage to warfighters by operating at wavelengths where the adversary is not likely to have access to appropriate ima ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  2. Human Performance Optimization

    SBC: HVMN Inc.            Topic: SOCOM17C001

    During altitude-induced hypoxia, operator cognitive and physical capacity degrades, compromising individual and team performance. Cognitive degradation is linked to falling brain energy levels, increased reliance on anaerobic energy production and lactate accumulation. Ketones are the evolutionary alternative substrate to glucose for brain metabolic requirements; previous studies demonstrated that ...

    STTR Phase II 2019 Department of DefenseSpecial Operations Command
  3. Human Performance Optimization

    SBC: REJUVENATE BIO INC            Topic: SOCOM17C001

    Special OperationsForces (SOF)are an integral aspect of the US military. SOF operators are among the most elite and highly qualified individuals in the U.S.military. As such, extraordinary physical and mental demands are placed upon them to excel in extreme environments for extended periods of time. This unrelenting cycle of combat deployments and intense pre-deployment training shortens the funct ...

    STTR Phase II 2019 Department of DefenseSpecial Operations Command
  4. 81mm Mortar Guidance Package

    SBC: OPTO-KNOWLEDGE SYSTEMS INC            Topic: SOCOM182001

    OKSI will design and build a Precision Guidance Seeker (PGS) for the 81 mm munition. We will enhance and port our target acquisition and tracking algorithms to a real-time processor onboard the PGS, which will receive target-scene imagery prior to launch or while in flight and will deploy post apogee. OKSI will test the algorithms extensively with a wide range of military-relevant real-world data ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  5. SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY

    SBC: Center For Planning & Research            Topic: N/A

    AN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS

    SBC: Expert-ease Systems            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  8. "SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"

    SBC: Fluid Physics Ind.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE CANDY CANE HOT LEG OF A B&W PLANT. THE PROPOSED PHASE I WORK PLAN CONSISTS OF (A) REVIEWING AVAILABLE WESTINGHOUSE EXPERIMENTAL DATA AND SIMULATING THE EXPERIMENTAL CONFIGURATION, (B) VALIDATING THE M ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. "EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  10. AGING PROCESSES IN NUCLEAR REACTORS

    SBC: Pdi Technology Inc            Topic: N/A

    AS NUCLEAR PLANTS GROW OLDER, ENVIRONMENTAL CONDITIONS MAY AFFECT THE PERFORMANCE OF PLANT CONCRETE AND STEEL STRUCTURES. WE PROPOSE TO DEVELOP A STRATEGY WHICH CAN BE APPLIED TO CONCRETE STRUCTURES. IT WILL BE DIRECTED TOWARDSTHE DEVELOPMENT OF METHODS TO ANALYZE AND UNDERSTAND AGING EFFECTS, INCLUDING THE COMBINED EFFECTS OF TIME, TEMPERATURE, RADIATION, HUMIDITY, STRESS, CHEMICAL ENVIRONMENT AN ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government