You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Power and Rechargeable Battery Interface Smart Module

    SBC: INTELLISENSE SYSTEMS INC            Topic: HSB0191003

    To address the DHS need for a module that can power/charge and provide effective power management of all on-body electronics including sensors, communications systems, and peripheral devices for all first responder mission areas, Intellisense Systems, Inc. (ISI) proposes to develop a new Power and Rechargeable Battery Interface Smart Module (PRISM). This proposed technology is based on a novel mod ...

    SBIR Phase I 2019 Department of Homeland Security
  2. Miniature Intelligent Spectral Analyzer

    SBC: INTELLISENSE SYSTEMS INC            Topic: HSB0181003

    Addressing the DHS need to rapidly detect radio interference of critical radio frequency (RF) communications channels utilized by first responders, Physical Optics Corporation (POC) proposes to advance, in Phase II, the development of the Miniature Intelligent Spectral Analyzer (MISCAN) system proven feasible in Phase I. MISCAN is based on a combination of commercial off-the-shelf (COTS) electroni ...

    SBIR Phase II 2019 Department of Homeland Security
  3. Remote Phone Locator for Improved Emergency Rescue

    SBC: Physical Optics Corporation            Topic: HSB0181002

    To address the DHS need for a cell phone location finder for maritime and remote search and rescue (SAR), Physical Optics Corporation (POC) proposes, in Phase II, to advance the development of the REmote Phone Locator for Improved Emergency Rescue (REPLIER), proven feasible in Phase I. REPLIER is based on a modification of open-source, full stack LTE software, allowing it to establish a wireless c ...

    SBIR Phase II 2019 Department of Homeland Security
  4. Virtualized Trusted Internet Connection (vTIC)

    SBC: METRONOME SOFTWARE, LLC            Topic: 19OATS003

    Metronome Software proposes the research and development of a VIRTICONN, a zero-trust system for Virtualized Trusted Internet Connections (vTIC). The effort aims to overcome the limitations of traditional network security to provide authenticated users access to private resources, typically via a VPN or TIC. This older approach increases the attack surface of an internal system as each user is rep ...

    SBIR Phase II 2019 Department of Homeland Security
  5. Cybersecurity Peer-to-Peer Knowledge/Lessons Learned Tool

    SBC: INFERLINK CORP            Topic: HSB0191006

    The increasing number of breaches and hacks against organizations demands new and more effective ways to provide defense. Currently, most defense activities, such as monitoring, analysis, forensics, and remediation are done within house. This is unfortunate because the external knowledge and experience of others outside the organization cannot easily be leveraged. Our proposal focuses on the desig ...

    SBIR Phase I 2019 Department of Homeland Security
  6. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    THERE HAS RECENTLY BEEN HEIGHTENED CONCERN FOR THE POSSIBILITY THAT NUCLEAR POWER-PLANT ACCIDENTS DURING SHUTDOWNS COULD BE IMPORTANT CONTRIBUTORS TO THE OVERALL RISK PROFILE OF THESE PLANTS. THE 1986 SOVIET ACCIDENT AT CHERNOBYL WAS THE PRINCIPAL EVENT THAT LED TO THIS HEIGHTENED CONCERN, BUT A FEW RECENT EVENTS AT U.S. PLANTS HAVE ALSO CONTRIBUTED. TODAY, IT IS WIDELY UNDERSTOOD THAT THE RISK OF ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  10. SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY

    SBC: Center For Planning & Research            Topic: N/A

    AN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government