You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication
SBC: Connected Wise LLC Topic: 180FH1Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...
SBIR Phase II 2019 Department of Transportation -
High Efficiency Cyclone Separator for Sub-micron Particle Concentration
SBC: MAINSTREAM ENGINEERING CORP Topic: DTRA182006The Radionuclide Aerosol Sampler and Analyzer (RASA) is a completely automated monitoring system that detects airborne radioactive particles and is one of the detection systems used in the U.S. and global International Monitoring System (IMS) of the Comprehensive Nuclear Test Ban Treaty Organization (CTBTO) to detect nuclear detonations. Mainstream proposes develop a high-efficiency cyclone separa ...
SBIR Phase I 2019 Department of DefenseDefense Threat Reduction Agency -
Guided Augmented Independence Travel Aid (GAIT-Aid)
SBC: Design Interactive, Inc. Topic: 180FT1Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...
SBIR Phase II 2019 Department of Transportation -
Comprehensive Operations and Planning Environment for Improving BRT Operations
SBC: SIMWRIGHT, INC. Topic: N/AIncreasing BRT ridership using ITS requires a holistic approach that addresses overall system performance. ITS applications supporting bus rapid transit (BRT) are typically single purpose applications. These applications usually support one facet of transit/transportation activities, e.g. transit planning, transit operations/maintenance, or transit end users. These "stovepipe" applications gene ...
SBIR Phase I 2004 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: WavesinSolids LLC Topic: N/AThis project will use an ultrasonic beam traveling logitudinally along the rail rather than the complex normal and angle-beams transducer assemblies in current systems. Detectio of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspectin reliability and robustness problems in current rail inspection systems. The simplified procedure will increase the r ...
SBIR Phase II 2004 Department of Transportation -
LARGE WAVES IN CHANNELS
SBC: Taylor & Divoky Inc. Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency