You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication

    SBC: Connected Wise LLC            Topic: 180FH1

    Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...

    SBIR Phase II 2019 Department of Transportation
  2. Guided Augmented Independence Travel Aid (GAIT-Aid)

    SBC: Design Interactive, Inc.            Topic: 180FT1

    Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...

    SBIR Phase II 2019 Department of Transportation
  3. FRP Smart Composite Pipe System

    SBC: SDR Engineering Consultants, Inc.            Topic: N/A

    The proposed research develops an innovative solution for a new SMART pipe system utilizing high-density polyethylene/fiber reinforced polymer (HDPE/FRP) composite system. The new pipe system utilizes a combination of three interacting materials: FFRP, HDPE, and concrete and is equipped with wireless sensors to provide mentoring capabilities during operations. The proposed system is suitable fo ...

    SBIR Phase I 2002 Department of Transportation
  4. Automated Driveway Access Management System Using a 3D Terrestrial Imagery User Interface

    SBC: SIMWRIGHT, INC.            Topic: N/A

    New developments in tools for exploitation of stereo aerial photography now enable desktop Windows applications capable of interfacing with existing GIS databases. One area of potential use for these tools is in the area of Highway Access Management especially as it relates to improvement in the process for Highway Driveways. Research is proposed to determine system requirements for using a digi ...

    SBIR Phase I 2002 Department of Transportation
  5. Automated Driveway Access Management System Using a 3D Terrestrial Imagery User Interface

    SBC: SIMWRIGHT, INC.            Topic: N/A

    New developments in tools for exploitation of stereo aerial photography now enable desktop Windows applications capable of interfacing with existing GIS databases. One area of potential use for these tools is in the area of Highway Access Management especially as it relates to improvement in the process for Highway Driveways. Research is proposed to determine system requirements for using a digi ...

    SBIR Phase II 2002 Department of Transportation
  6. Rapid Rail Inspection System

    SBC: WavesinSolids LLC            Topic: N/A

    This project will use an ultrasonic beam traveling longitudinally along the rail rather that the complex normal and angle-beams transducer assemblies in current systems. Detection of transverse defects becomes a simple pulse-echo application and resolves many inherent speed, inspection reliability and robustness problems in current rail inspection systems. The simplified procedure will increase ...

    SBIR Phase I 2002 Department of Transportation
  7. MOTION COMPENSATING SCALE

    SBC: General Oceanics Inc            Topic: N/A

    THE AIM OF THIS PROJECT IS TO DEVELOP A SCALE FOR WEIGHING LOADS OF UP TO 100 KG. ON MOVING PLATFORMS SUCH AS SHIPS. THE PROBLEM IN THESE SITUATIONS IS THAT ACCELERATION FORCES GENERATED BY THE MOTION OF THE VEHICLE CONSTANTLY VARY THE APPARENT WEIGHT OF ANY OBJECT RESTING ON THE SCALE. THE SOLUTION PROPOSED HERE IS TO USE AN ELECTRONIC SCALE AND COMBINE ITS ELECTRICAL OUTPUT SIGNAL WITH SIGNALS F ...

    SBIR Phase I 1987 Department of Commerce
  8. LOW COST HRPT DIRECT READOUT STATION

    SBC: International Systems & Soft-            Topic: N/A

    THIS ABSTRACT COVERS THE PROPOSED DESIGN OF A LOW COST HRPT DIRECT READOUT STATION FOR A COST OF LESS THAN $100K DOLL ARS. THIS CONCEPT UTILIZES STATE-OF-THE-ART TECHNOLOGY PROVEN SUCCESSFUL IN COMMERCIAL APPLICATIONS. THE SUCCESSFULDEVELOPMENT OF THE LOW-COST HRPT STATION WILL OPEN A COMMERCIAL AND GOVERNMENT MARKET THAT HAS A NEED FOR CURRENT WEATHER INFORMATION. THESE POTENTIAL USERS HAVE DELAY ...

    SBIR Phase II 1987 Department of Commerce
US Flag An Official Website of the United States Government