You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication
SBC: Connected Wise LLC Topic: 180FH1Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...
SBIR Phase II 2019 Department of Transportation -
Guided Augmented Independence Travel Aid (GAIT-Aid)
SBC: Design Interactive, Inc. Topic: 180FT1Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...
SBIR Phase II 2019 Department of Transportation -
Small Scale Diesel Generator for Railway Applications
SBC: MAINSTREAM ENGINEERING CORP Topic: 122FR1Autonomous inspection systems are necessary to increase awareness of track safety and maintenance issues. However, electrical power for these systems is not available under freight railway vehicles. Mainstream Engineering (MEC) proposes development of a small-scale diesel generator with an integrated starter-alternator (ISA) and automated battery charging circuit for this application. The proposed ...
SBIR Phase I 2013 Department of Transportation -
Demonstration of a Low-Cost Vehicle Monitoring
SBC: MAINSTREAM ENGINEERING CORP Topic: 112FM1During the Phase I SBIR Effort, Mainstream demonstrated a unique vehicle monitoring system (VMS) for tractor trailer applications. The development was driven by the need to easily store, retrieve, and transfer key trailer parameters to the tractor and the need to electronically transfer key driver, tractor, and trailer information to roadside inspectors and maintenance personnel. In Phase I, we ...
SBIR Phase II 2013 Department of Transportation -
A SYSTEMS APPROACH TO SECURITY CHECKPOINT OPTIMIZATION
SBC: International Productivity Topic: N/ATHE RESEARCH WILL IDENTIFY AND ANALYZE BOTH THE QUANTITATIVEAND QUALITATIVE ASPECTS OF SECURITY CHECKPOINT OPERATIONS. USING INDUSTRIAL ENGINEERING TECHNIQUES, SCREENING OPERATIONS WILL BE BROKEN INTO BASIC ELEMENTS WHICH WILL THEN BE MEASURED AND INVESTIGATED TO DETERMINE THE INTERRELATIONSHIPS BETWEEN SUCH COMPONENTS AS: - PROCESSING RATES - DISTRIBUTION OF PASSENGER ARRIVALS - BOARDING VOLUMES ...
SBIR Phase I 1989 Department of Transportation -
OVERHEAD INFRARED VEHICLE DETECTOR
SBC: Schwartz Electro-Optics, Inc Topic: N/ATHE SHORTCOMINGS OF THE WIDELY USED BURIED-LOOP VEHICLE DE- TECTOR -- 3 TO 5 YEAR LIFETIME, COSTLY, INCONVENIENT TO MAINTAIN/REPLE, INCOMPATIBLE WITH SOME ROADWAYS, UNRELIABLE ACTIVATION BY SOME VEHICLES -- CAN BE OVERCOME THROUGH THE USE OF OVERHEAD INFRARED VEHICLE DETECTORS. THE TECHNICAL OBJECTIVES OF THE PROPOSED RESEARCH INCLUDE A SURVEY OF APPROPRIATE INFRARED SENSORS AND DEVICE ANALYSIS, D ...
SBIR Phase II 1989 Department of Transportation