List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication

    SBC: Connected Wise LLC            Topic: 180FH1

    Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...

    SBIR Phase II 2019 Department of Transportation
  2. Guided Augmented Independence Travel Aid (GAIT-Aid)

    SBC: Design Interactive, Inc            Topic: 180FT1

    Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...

    SBIR Phase II 2019 Department of Transportation
  3. Scale-Up of ATPE Technology to Produce Highly Enriched Semiconducting SWCNTs

    SBC: SouthWest NanoTechnologies (SWeNT)            Topic: N/A

    Single-walled carbon nanotubes (SWCNTs) have unique material properties making them very attractive for use in a variety of electronic applications. However, as-grown SWCNTs contain a mixture of tubes with heterogeneous optical and electronic properties. The chiral species must be separated in order to maximize the desired properties. To date, no large scale separation process has been accomplishe ...

    SBIR Phase I 2014 Department of CommerceNational Institute of Standards and Technology
  4. Development of Innovative Corridor Assessment and Land Acquisition Management

    SBC: HSA Consulting, Inc            Topic: N/A

    Determination of new roadway alignments together with the acquisition of right of way needed to support these alignments is a complex multidisciplinary process. This process is further complicated when these decisions require consideration of potential for natural and environmental hazards. Analytical tools are needed to consider alternatives and to make meaningful cost benefit trades. These to ...

    SBIR Phase I 2003 Department of Transportation
  5. V-PSL and VISI_PSL: A Visual Language and Interactive Tool for PSL Generation

    SBC: Computer Aided Process Improvement, Inc.            Topic: N/A

    We propose developing a prototype of a GUI-based wizard that: ¿ Guides users through the steps that are needed to define their processes using PSL in a visual/textual manner. ¿ Checks for consistency/correctness according to PSL ontology. ¿ Generates the PSL description. We believe that VISI-PSL will facilitate the generation of PSL descriptions to the extent that it will be used by process ...

    SBIR Phase I 2003 Department of CommerceNational Institute of Standards and Technology

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government